Engineering Submittals

In continuation for MEP coordination, from ref. xxx

Date: xxx

Ref. xxx

Kind Attn:     Mr. xxx

Project:            2B + G + 14+ Lower Roof Hotels Building

Plot No.:          xxx at Al Barsha 1st, Dubai

Subject:           In continuation for MEP coordination, from ref. CC/MEP/03

Dear Tahir,

In continuation for MEP coordination, from ref CC/MEP/03, kindly review the following.

  1. Propose the generator supplier and generator size from drawing and check the plan of the generator room that adjusting door opening is enough for the generator shifting.
  2. We have reminded before about the central battery RFI was raised so it means you have the solution for the central battery placement. Kindly provide the approved drawing.
  3. We did not receive any letter from you related to any missing detailed drawing which are required from ID by comparing approved DM drawing and the ID document.
  4. We need the false ceiling final height which is approved in your shop drawing incorporating all services above the false ceiling as well as the require position of the access panel and size approved by the consultant as well as ID through client.
  5. The roof loading as per the supplier requirement for the tank and AC including all must be finalized as soon as possible since we need to design the PT slab
  6. We require the marking for duct and service route at basement to finish this area on priority basis.

Regards,

For xxx Contracting L.L.C

xxx

General Manager                      

Leave a Comment