Notification of Variation

Handing over the variation order no: 1, 2, 3 and 4 with our signature and stamp

Date:               xxx

Ref:                  xxx

Kind Attn         :Mr. xxx

Project:            2B + G + 14+ Lower Roof Hotel Building on Plot No. xxx at Al Barsha 1st, Dubai

Subject        : Handing over the variation order no: 1, 2, 3 and 4 with our signature and stamp as instructed

Dear Sir,

With reference to above, we are hereby handing over the following variation order documents with our signature and stamp as details mentioned below:

1) Letter ref No: AP/269/CC/475 – Variation order no-1 public area fit out works (All day dining and stag bar) by M/s Destec group

2) Letter ref No: AP/269/CC/476 – Variation order no-2 public area fit out works (reception including lavazza, pool bar and public toilet) by M/s Makstylo interiors

3) Letter ref No: AP/269/CC/477 – Variation order no-3 Supply, testing and commissioning of bar and kitchen equipment by M/s Emirates kitchen equipment LLC

4) Letter ref No: AP/269/CC/559 – Variation order no-4 Supply and installation of structured cabling work by M/s Cadd emirated and networking LLC

So, we are requesting to complete the signature and stamp for the remaining stakeholders and provide our copies for our record.

Regards,

For xxx Contracting L.L.C.

xxx

Project Manager