Guide line for surveyor work

Date: xxx

CC/SITE/07/16

Kind Attn:          Land surveyor

Project:             2B + G + 14 + Lower Roof Hotel Building

Plot No.:            373-1297 at Barsha, Dubai

Subject:           Guide line for surveyor work

Dear Surveyor,

Kindly note the following:

  1. Surveyor must report at the site to PM –Mr. xxx where all the level of points are to marked for that will be informed to him.
  2. Surveyor should not take away any machine at the site from the assigned area till the points are ready and checked by consultant.
  3. PM-Mr.xxx will inform QA/QC engineer, Site engineer to raise request for time of the inspection from consultant and will be given to surveyor.
  4. The surveyor is allowed to remove the machine after the points are received by Site engineer by taking his sign with time and date mentioned on it.
  5. Surveyor should register in his dairy the daily work done at the site and take signature from the PM

NOTE: If surveyor will not follow the above the above points his work is considered to be null and avoid, and will be considered absent for that day.

Regards,

For xxx Contracting L.L.C                                       

xxx                                                                                               

General Manager