Author name: Md Abu Zaed Khan

Hello, this is Engr. Zaed Khan Planning Engineer, Associate member of Society of Engineers UAE. Expert in construction project planning, FIDIC red book, computation of extension of time claim, Contract agreement and contractual letters.

surveyor work

Certification of Gate Level Marking

REF: No. xxx/1014/AA/2021/05 Date: xxx xxx ARCHITECTURAL & ENGINEERING CONSULTANCYOffice No. xxx, Sobha Ivory 2, Business Bay P.O. Box xxx, Dubai, UAE Project: Residential Villa (G+1) & Pump Room Block, On Plot No. xxxat Al Barari – Dubai, UAE for Mr. xxx Subject: Certification of Gate Level Marking Dear Sir, With reference to the aforementioned […]

Certification of Gate Level Marking Read Post »

Justification for Manpower in Month of April xxx

Project Team member’s introduction

REF: No. xxx/1014/AA/2021/03 Date: xxx xxx ARCHITECTURAL & ENGINEERING CONSULTANCYOffice No. xxx, Sobha Ivory 2, Business Bay P.O. Box xxx, Dubai, UAE Project: Residential Villa (G+1) & Pump Room Block, On Plot No. xxx at Al Barari – Dubai, UAE for Mr. xxx Subject: Project Team member’s introduction Dear Sir, With reference to the above

Project Team member’s introduction Read Post »

Contract Documents

Nominated Subcontractor M/S xxx Industries FZC response to the Subcontractor Agreement (Supply and Installation of Wardrobes)

Date                     : xxx Ref.                      : xxx/P1009/UHAC/2021/13 To                         : M/s. xxx Architectural Consultant P.O Box : xxx, Dubai, U.A.E Phone   : xxx, Fax : xxx Attention          : Mr. xxx – Projects Engineer Project                : Proposed Private G+1+R Villa on Plot No: xxx, At Al Barsha South First, Dubai-U.A.E. For Mr. xxx Subject              

Nominated Subcontractor M/S xxx Industries FZC response to the Subcontractor Agreement (Supply and Installation of Wardrobes) Read Post »

Undertaking Letter

Notification of delay

Date                    : XXX MCM Ref.           : XXX/P1010/AQQ/2021/01 To                         : XXX Air-Conditioning LLC. XXX, [email protected] Attention to     : Mr. XXX Project               : Proposed G+1+R Villa for Mr. XXX, Dubai. On Plot No. XXX, Al Barsha Second, Dubai. Subject               : Notification of delay Dear Mr. Ahmed, This is further to our continuous follow up since last six

Notification of delay Read Post »

CVI

Authority Violation

Date: xxx Ref.: xxx/1007/AGC/2021/44 Total Pages: 7 (photos attached) To          :              M/s. XXX Consultants P.O. Box: XXX, Dubai, UAE Phone: +XXX Attention:          Engr. Mohammed Abumeteir Project:               Proposed B+G+1 Villa for Mr. XXX, Plot No. XXX, Jumeirah First, Dubai. Subject:              DM Violation Dear Sir, This is further to the DM Violation with ref. BSXXX, below

Authority Violation Read Post »

Kalinga Stone

Submission of Commercial proposal for Wooden Cabinet

Ref.      :           XXX/1007/AGC/2021/39                                         Date: XXX To        :           M/s. XXX Consultants P.O. Box: XXX, Dubai, UAE. Phone: +XXX Fax: XXX Attention:       Mr.  XXX – Resident Engineer Project:           Proposed B+G+1 Villa for Mr. Faisal Al Gurg, Plot No. XXX, Jumeirah First, Dubai. Subject:           Submission of Commercial proposal for Wooden Cabinet Dear Sir, With reference to the

Submission of Commercial proposal for Wooden Cabinet Read Post »

calculate the variation from tender and revised drawing

Project overall progress status

P Ref.      :           XXX/1007/AGC/2021/40                                         Date: January 11, 2021 To        :           M/s. XXX Consultants P.O. Box: XXX, Dubai, UAE. Phone: +XXX Fax: +XXX Attention:       Mr.  XXX – Resident Engineer Project:           Proposed B+G+1 Villa for Mr. XXX, Plot No. XXX, Jumeirah First, Dubai. Subject:           Project overall progress status Dear Sir, With reference to aforementioned subject and

Project overall progress status Read Post »

Scroll to Top