Author name: Md Abu Zaed Khan

Hello, this is Engr. Zaed Khan Planning Engineer, Associate member of Society of Engineers UAE. Expert in construction project planning, FIDIC red book, computation of extension of time claim, Contract agreement and contractual letters.

calculate the variation from tender and revised drawing

Submission of Water supply Shop Drawings.

Ref: xxx Date: xxx To: P.O Box: xxx Tel: xxx, Fax: xxx Project                     : 2B+G+7 Residential Building, ICP1 CBD C01, International City Client                       : M/s xxx Properties Ltd Consultant             : M/s xxx Engineering Consultant. Subject: Submission of Water supply Shop Drawings. Dear Sir, With reference to above mentioned subject, we would like to inform you […]

Submission of Water supply Shop Drawings. Read Post »

Door handle

Submission of Final Door Handles Quantity

Ref: xxx Date: xxx To: P.O Box: xxx Tel: xxx, Fax: xxx Project                     : 2B+G+7 Residential Building, ICP1 CBD C01, International City Client                       : M/s xxx Properties Ltd Consultant             : M/s xxx Engineering Consultant. Subject: Submission of Final Door Handles Quantity . Dear Sir, With reference to the above mentioned subject, we would like to

Submission of Final Door Handles Quantity Read Post »

Bituminous-Membrane-Waterproofing

Inspection Request for waterproofing works.

Ref: xxx Date: xxx To: P.O Box: xxx Tel: xxx, Fax: xxx Project                     : 2B+G+7 Residential Building, ICP1 CBD C01, International City Client                       : M/s xxx Properties Ltd Consultant             : M/s xxx Engineering Consultant. Subject: Inspection Request for water proofing. Dear Sir, With reference to the above mentioned subject, we are intimating that water testing

Inspection Request for waterproofing works. Read Post »

hollow-metal-door

Delaying of 2nd Mock up Room Sample Door

Ref: xxx Date: xxx To: P.O Box: xxx Tel: xxx, Fax: xxx Project                     : 2B+G+7 Residential Building, ICP1 CBD C01, International City Client                       : M/s xxx Properties Ltd Consultant             : M/s xxx Engineering Consultant. Subject: Delaying of 2nd Mock up Room Sample Door. Dear Sir, With reference to the above mentioned subject, we would like

Delaying of 2nd Mock up Room Sample Door Read Post »

Submission of Generator technical

Ref: xxx Date: xxx To: P.O Box: xxx Tel: xxx, Fax: xxx Project                     : 2B+G+7 Residential Building, ICP1 CBD C01, International City Client                       : M/s xxx Properties Ltd Consultant             : M/s xxx Engineering Consultant. Subject: Submission of Generator technical Dear Sir, With reference to the above mentioned subject, we would like to inform you that

Submission of Generator technical Read Post »

G.I Duct work for Kitchen and Toilet

Ref: xxx Date: xxx To: P.O Box: xxx Tel: xxx, Fax: xxx Project                     : 2B+G+7 Residential Building, ICP1 CBD C01, International City Client                       : M/s xxx Properties Ltd Consultant             : M/s xxx Engineering Consultant. Subject: G.I Duct work for Kitchen and Toilet. Dear Sir, With reference to the above mentioned we would like to inform

G.I Duct work for Kitchen and Toilet Read Post »

Close the Leakage at 1st Basement

Ref: xxx Date: xxx To: P.O Box: xxx Tel: xxx, Fax: xxx Project                     : 2B+G+7 Residential Building, ICP1 CBD C01, International City Client                       : M/s xxx Properties Ltd Consultant             : M/s xxx Engineering Consultant. Subject: Close the Leakage at 1st Basement Dear Sir, With reference to the above mentioned subject, we are here by informing

Close the Leakage at 1st Basement Read Post »

ceiling-works

False Ceiling Clearance at 1st & 2nd Floor.

Ref: xxx Date: xxx To: P.O Box: xxx Tel: xxx, Fax: xxx Project                     : 2B+G+7 Residential Building, ICP1 CBD C01, International City Client                       : M/s xxx Properties Ltd Consultant             : M/s xxx Engineering Consultant. Subject: False Ceiling Clearance at 1st & 2nd Floor. Dear Sir, With reference to the above mentioned subject & project. We

False Ceiling Clearance at 1st & 2nd Floor. Read Post »

Submission of CFD (Basement Exhaust Fan) 3 set with soft copy.

Ref: xxx Date: xxx To: P.O Box: xxx Tel: xxx, Fax: xxx Project                     : 2B+G+7 Residential Building, ICP1 CBD C01, International City Client                       : M/s xxx Properties Ltd Consultant             : M/s xxx Engineering Consultant. Subject: Submission of CFD (Basement Exhaust Fan) 3 set with soft copy. Dear Sir, With reference to the above mentioned subject.

Submission of CFD (Basement Exhaust Fan) 3 set with soft copy. Read Post »

Safety Comply Report

Ref: xxx Date: xxx To: P.O Box: xxx Tel: xxx, Fax: xxx Project                     : 2B+G+7 Residential Building, ICP1 CBD C01, International City Client                       : M/s xxx Properties Ltd Consultant             : M/s xxx Engineering Consultant. Subject:      Safety Comply Report Dear Sir, All unwanted materials removed from CO2 plot area. All high level openings are closed with

Safety Comply Report Read Post »