Urgent Delivery for Substation Light Fitting Material.

METHOD STATEMENT FOR LIGHTING FIXTURES INSTALLATION

Ref: xxx Date: xxx To: P.O Box: xxx Tel: xxx, Fax: xxx Project                     : 2B+G+7 Residential Building, ICP1 CBD C01, International City Client                       : M/s xxx Properties Ltd Consultant             : M/s xxx Engineering Consultant. Subject: Urgent Delivery for Substation Light Fitting Material. Dear Sir With reference to the above mentioned subject, we would like to… Continue reading Urgent Delivery for Substation Light Fitting Material.

Roof Steel Structural Drawings and Calculation.

Roof Steel Structure

Ref: xxx Date: xxx To: P.O Box: xxx Tel: xxx, Fax: xxx Project                     : 2B+G+7 Residential Building, ICP1 CBD C01, International City Client                       : M/s xxx Properties Ltd Consultant             : M/s xxx Engineering Consultant. Subject: Roof Steel Structural Drawings and Calculation. Dear Sir With reference above mentioned subject, we would like to inform you that,… Continue reading Roof Steel Structural Drawings and Calculation.

submission of CFD analysis (soft copy) for Basement 1 & 2.

delivery of Tiles and cheque copy.

Ref: xxx Date: xxx To: P.O Box: xxx Tel: xxx, Fax: xxx Project                     : 2B+G+7 Residential Building, ICP1 CBD C01, International City Client                       : M/s xxx Properties Ltd Consultant             : M/s xxx Engineering Consultant. Subject: submission of CFD analysis (soft copy) for Basement 1 & 2. Dear Sir, With reference to the above mentioned subject,… Continue reading submission of CFD analysis (soft copy) for Basement 1 & 2.

Clearance for Garbage the chute work

Garbage chute

Ref: xxx Date: xxx To: P.O Box: xxx Tel: xxx, Fax: xxx Project                     : 2B+G+7 Residential Building, ICP1 CBD C01, International City Client                       : M/s xxx Properties Ltd Consultant             : M/s xxx Engineering Consultant. Subject: Clearance for Garbage the chute work. Dear Sir With reference to the above mentioned subject, we would like to inform… Continue reading Clearance for Garbage the chute work

Risk assessment submission for fire department.

3-tips-for-Fire-Pump

Ref: xxx Date: xxx To: P.O Box: xxx Tel: xxx, Fax: xxx Project                     : 2B+G+7 Residential Building, ICP1 CBD C01, International City Client                       : M/s xxx Properties Ltd Consultant             : M/s xxx Engineering Consultant. Subject: Risk assessment submission for fire department. Dear Sir With reference to the above mentioned subject, regarding the gas drawing consultant… Continue reading Risk assessment submission for fire department.

Request for the wooden frame installation

Door Frame installation

Ref: xxx Date: xxx To: P.O Box: xxx Tel: xxx, Fax: xxx Project                     : 2B+G+7 Residential Building, ICP1 CBD C01, International City Client                       : M/s xxx Properties Ltd Consultant             : M/s xxx Engineering Consultant. Subject: Request for the wooden frame installation Dear Sir With reference to the above mentioned subject, we would like to inform… Continue reading Request for the wooden frame installation

Requirement for the balance area tile.

Ref: xxx Date: xxx To: P.O Box: xxx Tel: xxx, Fax: xxx Project                     : 2B+G+7 Residential Building, ICP1 CBD C01, International City Client                       : M/s xxx Properties Ltd Consultant             : M/s xxx Engineering Consultant. Subject         : Requirement for the balance area tile. Dear Sir With reference to the above mentioned subject, we would like to… Continue reading Requirement for the balance area tile.

Submission of the GRC works Quotation from Three potential Contractors

Ref: xxx Date: xxx To: P.O Box: xxx Tel: xxx, Fax: xxx Project                     : 2B+G+7 Residential Building, ICP1 CBD C01, International City Client                       : M/s xxx Properties Ltd Consultant             : M/s xxx Engineering Consultant. Subject   : Submission of the GRC Quotation from Three potential      Contractors for GRC work at above mention project Dear Sir, With… Continue reading Submission of the GRC works Quotation from Three potential Contractors

Lower Roof 28 Days Cube Test Report.

concrete strength

Ref: xxx Date: xxx To: P.O Box: xxx Tel: xxx, Fax: xxx Project                     : 2B+G+7 Residential Building, ICP1 CBD C01, International City Client                       : M/s xxx Properties Ltd Consultant             : M/s xxx Engineering Consultant. Subject: Lower Roof 28 Days Cube Test Report. Dear Sir I hereby confirm and undertake that the Lower roof 28 days… Continue reading Lower Roof 28 Days Cube Test Report.

Notice for termination of contract, recovery of losses and your contract closer or settlement of any claim

Contract Documents

Ref: xxx Date: xxx To: P.O Box: xxx Tel: xxx, Fax: xxx Project                     : 2B+G+7 Residential Building, ICP1 CBD C01, International City Client                       : M/s xxx Properties Ltd Consultant             : M/s xxx Engineering Consultant. Subject: Regarding the Notice for termination of contract, recovery of losses                 and your contract closer or settlement of any claim        … Continue reading Notice for termination of contract, recovery of losses and your contract closer or settlement of any claim

Exit mobile version