Author name: Md Abu Zaed Khan

Hello, this is Engr. Zaed Khan Planning Engineer, Associate member of Society of Engineers UAE. Expert in construction project planning, FIDIC red book, computation of extension of time claim, Contract agreement and contractual letters.

Painting works

Issue regarding third resubmission of internal paint sample boards

Date:               xxx Ref:                  xxx Kind Attn         :Mr. xxx Project:            2B + G + 14+ Lower Roof Hotel Building on Plot No. xxx at Al Barsha 1st, Dubai Subject         :  Issue regarding third resubmission of internal paint sample boards and final submission with request to forward the same to ID. Dear Sir, With reference to the […]

Issue regarding third resubmission of internal paint sample boards Read Post »

Engineering Submittals

No objection to retain the originally approved beam enforcement and size

Date:               xxx Ref:                  xxx Kind Attn         :Mr. xxx Project:            2B + G + 14+ Lower Roof Hotel Building on Plot No. xxx at Al Barsha 1st, Dubai Subject         : Our no objection to retain the originally approved beam enforcement and   size Dear Sir, With reference to the above, we are hereby confirming that we have

No objection to retain the originally approved beam enforcement and size Read Post »

dry wall partition works

Revision in the wall design by increasing the acoustic value from 45 dB to 55 dB,                           Replace wall P07 to P02

Date:               xxx Ref:                  xxx Kind Attn         :Mr. xxx Project:            2B + G + 14+ Lower Roof Hotel Building on Plot No. xxx at Al Barsha 1st, Dubai Dear Sir, With reference to the above, the toilet wall between Unit No.1 & 2 as well as Unit No. 3 & 4 in our approved drawing for

Revision in the wall design by increasing the acoustic value from 45 dB to 55 dB,                           Replace wall P07 to P02 Read Post »

awaiting-response

Intimation to the new Document controller authorization to transmit documents.

Date:               xxx Ref:                  xxx Kind Attn         :Mr. xxx Project:            2B + G + 14+ Lower Roof Hotel Building on Plot No. xxx at Al Barsha 1st, Dubai Subject         :    Intimation to the new Document controller authorization to transmit documents. Dear Sir, With reference to the above, we are hereby informing Engr. xxx Indulal has been

Intimation to the new Document controller authorization to transmit documents. Read Post »

Engineering Submittals

Submission of MEP Variation Summary

Date:               xxx Ref:                  xxx Kind Attn         :Mr. xxx Project:            2B + G + 14+ Lower Roof Hotel Building on Plot No. xxx at Al Barsha 1st, Dubai Subject             Submission of MEP Variation Summary Dear Sir, With reference to the above we are hereby submitting the MEP Variation as per the changes in Drawings issued from

Submission of MEP Variation Summary Read Post »

Vanity Counter

Reply to your letter regarding Vanity counters

Date:               xxx Ref:                  xxx Kind Attn         :Mr. xxx Project:            2B + G + 14+ Lower Roof Hotel Building on Plot No. xxx at Al Barsha 1st, Dubai Subject        Reply to your letter Ref : AP/269/CC/288 dated 26.03.2017 regarding Vanity counters Dear Sir, With reference to the above and your letter Ref : CC/AP/348/17 we clarify

Reply to your letter regarding Vanity counters Read Post »

Tile Installation

Tiling work under hold at Basement toilet

Date:               xxx Ref:                  xxx Kind Attn         :Mr. xxx Project:            2B + G + 14+ Lower Roof Hotel Building on Plot No. xxx at Al Barsha 1st, Dubai Subject         Regarding tiling work under hold at Basement toilet, Ground floor and First floor Dear Sir, With reference to above , we have provided the BOH quantity  through

Tiling work under hold at Basement toilet Read Post »

Vanity Counter

Work under hold for vanity counter design issue

Date:               xxx Ref:                  xxx Kind Attn         :Mr. xxx Project:            2B + G + 14+ Lower Roof Hotel Building on Plot No. 373-1297 at Al Barsha 1st, Dubai Subject        Work under hold for vanity counter design issue and comments on submittals “approved as noted for 175kg” Dear Sir, With reference to above and as per our

Work under hold for vanity counter design issue Read Post »

Shop Drawing

Garbage room drawing details not available

Date:               xxx Ref:                  xxx Kind Attn         :Mr. xxx Project:            2B + G + 14+ Lower Roof Hotel Building on Plot No. 373-1297 at Al Barsha 1st, Dubai Subject:          Regarding Garbage room drawing details not available till date for variation and revision in MEP shop drawing (work under hold) Dear  Sir, With reference to the above,

Garbage room drawing details not available Read Post »

Concrete Slump Test

Addition of admixture in Approved Mix Design

Date:               xxx Ref:                  xxx Kind Attn         :Mr. xxx Project:            2B + G + 14+ Lower Roof Hotel Building on Plot No. xxx at Al Barsha 1st, Dubai Subject:     Addition of admixture in Approved Mix Design to Overcome Friction Losses and Maintain Design Slump at  Slab Pouring Level (attached mix design 60N/ mm²) Dear  Sir,      

Addition of admixture in Approved Mix Design Read Post »