Planning: Sufficient numbers of trained operatives and competent supervision must be available before work starts. Sufficient and suitable plant must be available for trench support before work starts. Suitable monitoring equipment and personnel trained in its use will be required where known exposure to toxic substances or lack of oxygen may occur. Location of existing services must be complete before work starts, also information obtained on ground conditions from site surveys.
2
Managerial/Supervisory: Ensure safe system of work provided, taking account of prevailing conditions including weather, traffic and existing structures. Provide suitable PPE as required and ensure its correct use. Inspect supported excavations before each shift, and record details, also following any destabilising event or fall of material. Ensure personnel selected are capable, fit and experienced unless under direct supervision. COSHH assessments are to be made of substances likely to be found or produced during the work.
3
Training: Supervisors must have received training in COSHH appreciation, general site safety, theory and practice of excavation work. Operatives must have received training in excavation support procedures and use of cable location devices. This applied to sub contractors as well as direct employees. Toolbox talks on Excavation work, MHO’s, COSHH and Noise will be given at regular intervals.
INTRODUCTION:- The project is Consist “Proposed B+G+1 Villa on Plot No. 3320300 at Jumeirah First, Dubai for “Mr. Faisal Abdulla Saleh Al Gurg” THE METHOD…
CONTENTS PURPOSE SCOPE REFERENCES DEFINITIONS RESPONSIBILITIES MATERIALS & EQUIPMENT PROCEDURE PURPOSE: The purpose of this method statement is to define the procedure for internal and…