CTIVITY HAZARD ANALYSIS – Construction of AGL Ducts & installation of precast AGL Lighting Pits

Risk Assessment Procedure Step wise Guide

HAZARD / WORK:       AHA Construction of AGL Ducts & installation of precast AGL Lighting Pits LOCATION:______________________________________________ H=High                        M=Medium                   L=Low                                Significant Risks H M L   Who May Be Harmed 1 Work related upper limb disorders. Musculoskeletal injuries. Cuts, abrasions. Foot / toe injuries     X       2 Dehydration, heat exhaustion. Heat stroke… Continue reading CTIVITY HAZARD ANALYSIS – Construction of AGL Ducts & installation of precast AGL Lighting Pits

Method Statement for Protection of Existing Gas Pipelines Using Precast Concrete Slabs

HDPE PIPE BUTT WELDING PROCEDURES

CONTENTS Purpose Scope of Work Definitions References Materials Plant  & Equipment Safety Prior Activities Procedure Responsibilities Attachments 1.0      Purpose To ensure that the protection of existing gas pipelines using precast concrete slabs, and related activities are executed safely and in accordance with the contract requirements and that all quality assurance / control activities are conducted… Continue reading Method Statement for Protection of Existing Gas Pipelines Using Precast Concrete Slabs

Method Statement for Excavation and Foundation Preparation of Box Culvert

Method Statement for Sub base and Gravel Base

Table of Contents Purpose Scope of Work Definitions References Materials Plant  & Equipment Safety Prior Activities Procedure Responsibilities Attachments   1.0       Purpose To ensure that all excavation and foundation preparation of Box Culvert activities are executed safely and in accordance with the contract requirements and that all quality assurance / control activities are conducted in… Continue reading Method Statement for Excavation and Foundation Preparation of Box Culvert

JOB HAZARD ANALYSIS Method Statement for Excavation and Foundation Preparation of Box Culvert

Risk Assessment Procedure Step wise Guide

  TASK: ­­­­­­­­Excavation and foundation preparation of Box culvert     Date:15th July 2006 No ACTIVITY HAZARD RISK CONTROL MEASURES TO MINIMISE / ELIMINATE RISK RESPONSIBLE PERSON 1 Service location survey Manual handling operations (MHO’s) Work related upper limb disorders. Musculoskeletal injuries. Cuts, abrasions. Foot / toe injuries Maximum use of equipment to reduce need… Continue reading JOB HAZARD ANALYSIS Method Statement for Excavation and Foundation Preparation of Box Culvert

ACTIVITY HAZARD ANALYSIS Excavation and Foundation preparation of Box Culvert

Risk Assessment Procedure Step wise Guide

HAZARD / WORK: Excavation and Foundation preparation of Box Culvert LOCATION:______________________________________________ H=High                        M=Medium                   L=Low                                Significant Risks H M L   Who May Be Harmed 1 Work related upper limb disorders. Musculoskeletal injuries. Cuts, abrasions. Foot / toe injuries     X       2 Dehydration, heat exhaustion. Heat stroke     X   Employees……………………… Continue reading ACTIVITY HAZARD ANALYSIS Excavation and Foundation preparation of Box Culvert

JOB HAZARD ANALYSIS TOOLBOX TALKS ATTACHMENTS

Risk Assessment Procedure Step wise Guide

Toolbox talks:-Manual HandlingCOSHHNOISE Manual Handling We lift, maneuver and handle goods every day of our lives in one way or another, not just whilst at work but also during social activities such as gardening, DIY, shopping and sport. A bad back or injury today, could, and regularly does, turn into a painful back problem for… Continue reading JOB HAZARD ANALYSIS TOOLBOX TALKS ATTACHMENTS

Method Statement for Construction of cast-in-situ chambers (Wash out, air release, gate valve chamber, hydrant & water meter chamber)

METHOD STATEMENT FOR MV CABLE PULLING AND INSTALLATION

CONTENTS Scope of Work Definitions References Subcontractors Materials Plant  & Equipment Safety Prior Activities Procedure Responsibilities Attachments 1. Scope: 1.1 This Method Statement covers the construction of cast-in-situ chambers of the fire and water supply network intended for the wash out, air release valve, gate valve and hydrant elements. 2. Definitions: 2.1     MS: STM Method… Continue reading Method Statement for Construction of cast-in-situ chambers (Wash out, air release, gate valve chamber, hydrant & water meter chamber)

Exit mobile version