CONTENTS Purpose Scope of Work Definitions References Materials Plant & Equipment Safety Prior Activities Procedure Responsibilities Attachments 1.0 Purpose To ensure that placing of sub-base and gravel base by pavers, and related activities are executed safely and in accordance with the contract requirements and that all quality assurance / control activities are conducted in a… Continue reading Method Statement for Placing Sub-Base and Gravel Base by Pavers
Month: October 2022
Method Statement for Casting of Blinding Concrete for Box Culvert and Installation of Precast Box Culvert Units
TABLE OF CONTENTS Purpose Scope of Work Definitions References Materials Plant & Equipment Safety Prior Activities Procedure Responsibilities Attachments 1. Purpose 1.1 To ensure that the Blinding of Box Culverts and Installation of Precast Box Culvert units are executed safely and in accordance with the contract requirements and that all quality assurance/ control activities are… Continue reading Method Statement for Casting of Blinding Concrete for Box Culvert and Installation of Precast Box Culvert Units
JOB HAZARD ANALYSIS Casting Blinding concrete and Installation of Precast Box culverts
TASK: Casting Blinding concrete and Installation of Precast Box culverts Date:5th Aug 2006 No ACTIVITY HAZARD RISK CONTROL MEASURES TO MINIMISE / ELIMINATE RISK RESPONSIBLE PERSON 1 Service location survey Manual handling operations (MHO’s) Work related upper limb disorders. Musculoskeletal injuries. Cuts, abrasions. Foot / toe injuries Maximum use of equipment… Continue reading JOB HAZARD ANALYSIS Casting Blinding concrete and Installation of Precast Box culverts
ACTIVITY HAZARD ANALYSIS Casting Blinding Concrete and Installation of Precast Box Culvert Units
HAZARD / WORK: Casting Blinding Concrete and Installation of Precast Box Culvert Units LOCATION:______________________________________________ H=High M=Medium L=Low Significant Risks H M L Who May Be Harmed 1 Work related upper limb disorders. Musculoskeletal injuries. Cuts, abrasions. Foot / toe injuries X 2 Dehydration, heat exhaustion. Heat stroke … Continue reading ACTIVITY HAZARD ANALYSIS Casting Blinding Concrete and Installation of Precast Box Culvert Units
METHOD STATEMENT FOR PLACING OF SELECT FILL
Table of Contents Purpose Scope of Work Definitions References Materials Plant & Equipment Safety Prior Activities Procedure Responsibilities Attachments 1.0 Purpose To ensure that placing of select fill material and related activities are executed safely and in accordance with the contract requirements and that all quality assurance / control activities are conducted in a systematic… Continue reading METHOD STATEMENT FOR PLACING OF SELECT FILL
JOB HAZARD ANALYSIS PLACING OF SELECT FILL
The responsible person is to ensure the control measures below are in place before the activity is carried out TASK: Placing of Select Fill Date:07 October 2006 No ACTIVITY HAZARD RISK CONTROL MEASURES TO MINIMISE / ELIMINATE RISK RESPONSIBLE PERSON 1 Service location survey Manual handling operations (MHO’s) Work related upper limb… Continue reading JOB HAZARD ANALYSIS PLACING OF SELECT FILL
ACTIVITY HAZARD ANALYSIS PLACING OF SELECT FILL
HAZARD / WORK: PLACING OF SELECT FILL LOCATION:______________________________________________ H=High M=Medium L=Low Significant Risks H M L Who May Be Harmed 1 Work related upper limb disorders. Musculoskeletal injuries. Cuts, abrasions. Foot / toe injuries. X 2 Dehydration, heat exhaustion. Heat stroke X Employees…………………… X 3 Cuts,… Continue reading ACTIVITY HAZARD ANALYSIS PLACING OF SELECT FILL
JOB HAZARD ANALYSIS TOOLBOX TALKS ATTACHMENTS Manual Handling COSHH Excavations NOISE
Toolbox talks:-Manual HandlingCOSHHExcavationsNOISE Manual Handling We lift, manoeuvre and handle goods every day of our lives in one way or another, not just whilst at work but also during social activities such as gardening, DIY, shopping and sport. A bad back or injury today, could, and regularly does, turn into a painful back problem for… Continue reading JOB HAZARD ANALYSIS TOOLBOX TALKS ATTACHMENTS Manual Handling COSHH Excavations NOISE
Method Statement for Construction of AGL Ducts and Installation of Precast AGL Lighting Pits
CONTENTS Scope of Work Definitions References Subcontractors Materials Plant & Equipment Safety Prior Activities Procedure Responsibilities Attachments Scope of Work This procedure is applicable to the following works associated with the project titled, “New 2k Runway- Main Runway Works” – Contract Number NRTW-1008-CN. This method statement outlines the procedures to be followed in the construction… Continue reading Method Statement for Construction of AGL Ducts and Installation of Precast AGL Lighting Pits
JOB HAZARD ANALYSIS Construction of AGL Ducts & installation of precast AGL Lighting Pits
The responsible person is to ensure all the controls below are in place before the activity takes place TASK: Construction of AGL Ducts & installation of precast AGL Lighting Pits Date: 04 November 2006 No ACTIVITY HAZARD RISK CONTROL MEASURES TO MINIMISE / ELIMINATE RISK RESPONSIBLE PERSON 1 Service location survey… Continue reading JOB HAZARD ANALYSIS Construction of AGL Ducts & installation of precast AGL Lighting Pits