Method Statement for Placing Sub-Base and Gravel Base by Pavers

Method Statement for Sub base and Gravel Base

CONTENTS Purpose Scope of Work Definitions References Materials Plant  & Equipment Safety Prior Activities Procedure Responsibilities Attachments 1.0    Purpose To ensure that placing of sub-base and gravel base by pavers, and related activities are executed safely and in accordance with the contract requirements and that all quality assurance / control activities are conducted in a… Continue reading Method Statement for Placing Sub-Base and Gravel Base by Pavers

Method Statement for Casting of Blinding Concrete for Box Culvert and Installation of Precast Box Culvert Units

METHOD STATEMENT FOR MV CABLE PULLING AND INSTALLATION

TABLE OF CONTENTS Purpose Scope of Work Definitions References Materials Plant  & Equipment Safety Prior Activities Procedure Responsibilities Attachments 1. Purpose 1.1 To ensure that the Blinding of Box Culverts and Installation of Precast Box Culvert units are executed safely and in accordance with the contract requirements and that all quality assurance/ control activities are… Continue reading Method Statement for Casting of Blinding Concrete for Box Culvert and Installation of Precast Box Culvert Units

JOB HAZARD ANALYSIS Casting Blinding concrete and Installation of Precast Box culverts

Hazard Meaning and Definition

  TASK: ­­­­­­­­ Casting Blinding concrete and Installation of Precast Box culverts     Date:5th Aug 2006 No ACTIVITY HAZARD RISK CONTROL MEASURES TO MINIMISE / ELIMINATE RISK RESPONSIBLE PERSON 1 Service location survey Manual handling operations (MHO’s) Work related upper limb disorders. Musculoskeletal injuries. Cuts, abrasions. Foot / toe injuries Maximum use of equipment… Continue reading JOB HAZARD ANALYSIS Casting Blinding concrete and Installation of Precast Box culverts

ACTIVITY HAZARD ANALYSIS Casting Blinding Concrete and Installation of Precast Box Culvert Units

Risk Assessment Procedure Step wise Guide

HAZARD / WORK: Casting Blinding Concrete and Installation of Precast                                          Box Culvert Units LOCATION:______________________________________________ H=High                        M=Medium                   L=Low                                Significant Risks H M L   Who May Be Harmed 1 Work related upper limb disorders. Musculoskeletal injuries. Cuts, abrasions. Foot / toe injuries     X       2 Dehydration, heat exhaustion. Heat stroke  … Continue reading ACTIVITY HAZARD ANALYSIS Casting Blinding Concrete and Installation of Precast Box Culvert Units

METHOD STATEMENT FOR PLACING OF SELECT FILL

ACTIVITY HAZARD ANALYSIS PLACING OF SELECT FILL

Table of Contents Purpose Scope of Work Definitions References Materials Plant  & Equipment Safety Prior Activities Procedure Responsibilities Attachments 1.0       Purpose To ensure that placing of select fill material and related activities are executed safely and in accordance with the contract requirements and that all quality assurance / control activities are conducted in a systematic… Continue reading METHOD STATEMENT FOR PLACING OF SELECT FILL

JOB HAZARD ANALYSIS PLACING OF SELECT FILL

ACTIVITY HAZARD ANALYSIS PLACING OF SELECT FILL

The responsible person is to ensure the control measures below are in place before the activity is carried out   TASK: Placing of Select Fill     Date:07 October 2006 No ACTIVITY HAZARD RISK CONTROL MEASURES TO MINIMISE / ELIMINATE RISK RESPONSIBLE PERSON 1 Service location survey Manual handling operations (MHO’s) Work related upper limb… Continue reading JOB HAZARD ANALYSIS PLACING OF SELECT FILL

ACTIVITY HAZARD ANALYSIS PLACING OF SELECT FILL

ACTIVITY HAZARD ANALYSIS PLACING OF SELECT FILL

HAZARD / WORK: PLACING OF SELECT FILL LOCATION:______________________________________________ H=High                        M=Medium                   L=Low                                Significant Risks H M L   Who May Be Harmed 1 Work related upper limb disorders. Musculoskeletal injuries. Cuts, abrasions. Foot / toe injuries.     X       2 Dehydration, heat exhaustion. Heat stroke     X   Employees…………………… X 3 Cuts,… Continue reading ACTIVITY HAZARD ANALYSIS PLACING OF SELECT FILL

JOB HAZARD ANALYSIS TOOLBOX TALKS ATTACHMENTS Manual Handling COSHH Excavations NOISE

Hazard Meaning and Definition

Toolbox talks:-Manual HandlingCOSHHExcavationsNOISE Manual Handling We lift, manoeuvre and handle goods every day of our lives in one way or another, not just whilst at work but also during social activities such as gardening, DIY, shopping and sport. A bad back or injury today, could, and regularly does, turn into a painful back problem for… Continue reading JOB HAZARD ANALYSIS TOOLBOX TALKS ATTACHMENTS Manual Handling COSHH Excavations NOISE

Method Statement for Construction of AGL Ducts and Installation of Precast AGL Lighting Pits

METHOD STATEMENT FOR MV CABLE PULLING AND INSTALLATION

CONTENTS Scope of Work Definitions References Subcontractors Materials Plant  & Equipment Safety Prior Activities Procedure Responsibilities Attachments Scope of Work This procedure is applicable to the following works associated with the project titled, “New 2k Runway- Main Runway Works” – Contract Number NRTW-1008-CN. This method statement outlines the procedures to be followed in the construction… Continue reading Method Statement for Construction of AGL Ducts and Installation of Precast AGL Lighting Pits

JOB HAZARD ANALYSIS Construction of AGL Ducts & installation of precast AGL Lighting Pits

Hazard Meaning and Definition

The responsible person is to ensure all the controls below are in place before the activity takes place   TASK: ­­­­­­­ Construction of AGL Ducts & installation of precast AGL Lighting Pits     Date: 04 November 2006 No ACTIVITY HAZARD RISK CONTROL MEASURES TO MINIMISE / ELIMINATE RISK RESPONSIBLE PERSON 1 Service location survey… Continue reading JOB HAZARD ANALYSIS Construction of AGL Ducts & installation of precast AGL Lighting Pits

Exit mobile version