Method Statement for Protection of Existing Gas Pipelines Using Precast Concrete Slabs

HDPE PIPE BUTT WELDING PROCEDURES

CONTENTS Purpose Scope of Work Definitions References Materials Plant  & Equipment Safety Prior Activities Procedure Responsibilities Attachments 1.0      Purpose To ensure that the protection of existing gas pipelines using precast concrete slabs, and related activities are executed safely and in accordance with the contract requirements and that all quality assurance / control activities are conducted… Continue reading Method Statement for Protection of Existing Gas Pipelines Using Precast Concrete Slabs