METHOD STATEMENT FOR Audio  Visual  System  INSTALLATION

METHOD STATEMENT FOR Audio  Visual  System  INSTALLATION TABLE OF CONTENTS 1. SCOPE 2. definitions 3. HEALTH  AND  SAFETY 4. OPERATION 5. installation  and  fixation 6. RESPONSIBILITIES 7. MANPOWER  REQUIRED 8. MATERIALS  REQUIREMENTS 9. EQUIPMENTs  REQUIREMENTs 10. WASTE  MANAGEMENT 11. SPECIAL  CONTROL  MEASURES 12. SUPPORTING  DOCUMENTATION 13. DISTRIBUTION 1. SCOPE This procedure to clear the method… Continue reading METHOD STATEMENT FOR Audio  Visual  System  INSTALLATION

METHOD STATEMENT FOR ACCESS CONTROL SYSTEM INSTALLATION

ACCESS-CONTROL-SYSTEMS

METHOD STATEMENT FOR ACCESS CONTROL SYSTEM INSTALLATION TABLE OF CONTENTS 1. SCOPE 2. definitions 3. HEALTH  AND  SAFETY 4. OPERATION 5. installation and fixation 6. RESPONSIBILITIES 7. MANPOWER  REQUIRED 8. MATERIALS  REQUIREMENTs 9. EQUIPMENTs  REQUIREMENTs 10. WASTE MANAGEMENT 11. SPECIAL CONTROL MEASURES 12. SUPPORTING  DOCUMENTATION 13. DISTRIBUTION 1. SCOPE This procedure to clear the method… Continue reading METHOD STATEMENT FOR ACCESS CONTROL SYSTEM INSTALLATION

LETTER OF ACCEPTANCE (LOA) – Supply of deformed Steel Bars with cut & bend

steel rebar for reinforcement concrete at construction site with house under construction background

Ref:       xxx/1020/LOA/SC/2022/02 Date:     24 August xxx To:         xxx Middle East Traders LLC                                 P.O. Box: xxx, Dubai- UAE. Phone: +xxx FAO:      Mr. xxx                                        Project: Residential Villa (G+1) & Service Block (R-9) Villa, On Plot No. xxx at Al Barari, – Dubai, UAE Subject: LETTER OF ACCEPTANCE (LOA) – Supply of… Continue reading LETTER OF ACCEPTANCE (LOA) – Supply of deformed Steel Bars with cut & bend

Reply: Kick of Meeting (email)

Engineering Submittals

Ref. xx/1020/AA/2021/01 Date: 29 November xx To:                       M/s. xxx ARCHITECTURAL & ENGINEERING CONSULTANCYOffice No. xxx, Sobha Ivory 2, Business Bay P.O. Box xxx, Dubai, UAE Attention:         Engr. xxx – Resident Engineer Project:              Proposed G+1 & Service Block (R-9) Villa, On Plot No. xxx at Al xxx – Dubai, UAE. Client:                Mr. xxx… Continue reading Reply: Kick of Meeting (email)

withdrawal of our Submitted Project ref. MCM-1021-TS-GEN-04-00 dated 12th September xxx

awaiting-response

Ref:       xxx/1021/A&B/2022/02 Date:     September 16, xxx To:         xxx Consulting  Architects  &  Engineers                                                              PO Box No.: xxx Dubai, UAE Phone: xxx                                                                            Project: Proposed Warehouses, on Plot No. xxx at Al Khabaisi, Dubai, UAE. Client:  xxx Subject: withdrawal of our Submitted Project ref. MCM-1021-TS-GEN-04-00 dated 12th September xxx. Dear Sir, With reference… Continue reading withdrawal of our Submitted Project ref. MCM-1021-TS-GEN-04-00 dated 12th September xxx

Project baseline programme and additional duration for variation works & testing and Commissioning

Critical Path

Ref:       MCM/1021/A&B/2022/03 Date:     xxx, xx To:         xxx Consulting  Architects  &  Engineers                                                              PO Box No.: xxx Dubai, UAE Phone: xxx                                                                           Project: Proposed Warehouses, on Plot No. xxx at Al Khabaisi, Dubai, UAE. Client:  xxx Subject: Project baseline programme and additional duration for variation works & testing and Commissioning. Dear Sir, With… Continue reading Project baseline programme and additional duration for variation works & testing and Commissioning

Demolition of existing watchman room

Demolition of existing watchman room

Ref: No. MCM/1015/ABC/2022/04 Date: xxx, 2022 To:         xxx Consulting  Architects  &  Engineers                                                              PO Box No.: xxx Dubai, UAE Phone: xxx                                                                            Project: Proposed Warehouses, on Plot No. xxx at Al Khabaisi, Dubai, UAE. Subject: Demolition of existing watchman room Dear Sir, With reference to the above subject, we would like to inform you… Continue reading Demolition of existing watchman room

Reply – Notice of Delay

Reply - Notice of Delay

Ref:       XXX/1021/A&B/2022/01 Date:     8 June XX To:         XXX Consulting  Architects  &  Engineers                                                              PO Box No.: XX Dubai, UAE Phone: XXX                                                                            Project: Proposed Warehouses On Plot No. xxx at xxx, Dubai, UAE. Subject: Re: Notice of Delay Dear Sir, In response to your letter ref. xxx-14 dated xxx 2022, we thank… Continue reading Reply – Notice of Delay