METHOD STATEMENT FOR Audio Visual System INSTALLATION TABLE OF CONTENTS 1. SCOPE 2. definitions 3. HEALTH AND SAFETY 4. OPERATION 5. installation and fixation 6. RESPONSIBILITIES 7. MANPOWER REQUIRED 8. MATERIALS REQUIREMENTS 9. EQUIPMENTs REQUIREMENTs 10. WASTE MANAGEMENT 11. SPECIAL CONTROL MEASURES 12. SUPPORTING DOCUMENTATION 13. DISTRIBUTION 1. SCOPE This procedure to clear the method… Continue reading METHOD STATEMENT FOR Audio Visual System INSTALLATION
Month: October 2022
METHOD STATEMENT FOR ACCESS CONTROL SYSTEM INSTALLATION
METHOD STATEMENT FOR ACCESS CONTROL SYSTEM INSTALLATION TABLE OF CONTENTS 1. SCOPE 2. definitions 3. HEALTH AND SAFETY 4. OPERATION 5. installation and fixation 6. RESPONSIBILITIES 7. MANPOWER REQUIRED 8. MATERIALS REQUIREMENTs 9. EQUIPMENTs REQUIREMENTs 10. WASTE MANAGEMENT 11. SPECIAL CONTROL MEASURES 12. SUPPORTING DOCUMENTATION 13. DISTRIBUTION 1. SCOPE This procedure to clear the method… Continue reading METHOD STATEMENT FOR ACCESS CONTROL SYSTEM INSTALLATION
LETTER OF ACCEPTANCE (LOA) – Supply of deformed Steel Bars with cut & bend
Ref: xxx/1020/LOA/SC/2022/02 Date: 24 August xxx To: xxx Middle East Traders LLC P.O. Box: xxx, Dubai- UAE. Phone: +xxx FAO: Mr. xxx Project: Residential Villa (G+1) & Service Block (R-9) Villa, On Plot No. xxx at Al Barari, – Dubai, UAE Subject: LETTER OF ACCEPTANCE (LOA) – Supply of… Continue reading LETTER OF ACCEPTANCE (LOA) – Supply of deformed Steel Bars with cut & bend
withdrawal of our Submitted Project ref. MCM-1021-TS-GEN-04-00 dated 12th September xxx
Ref: xxx/1021/A&B/2022/02 Date: September 16, xxx To: xxx Consulting Architects & Engineers PO Box No.: xxx Dubai, UAE Phone: xxx Project: Proposed Warehouses, on Plot No. xxx at Al Khabaisi, Dubai, UAE. Client: xxx Subject: withdrawal of our Submitted Project ref. MCM-1021-TS-GEN-04-00 dated 12th September xxx. Dear Sir, With reference… Continue reading withdrawal of our Submitted Project ref. MCM-1021-TS-GEN-04-00 dated 12th September xxx
Project baseline programme and additional duration for variation works & testing and Commissioning
Ref: MCM/1021/A&B/2022/03 Date: xxx, xx To: xxx Consulting Architects & Engineers PO Box No.: xxx Dubai, UAE Phone: xxx Project: Proposed Warehouses, on Plot No. xxx at Al Khabaisi, Dubai, UAE. Client: xxx Subject: Project baseline programme and additional duration for variation works & testing and Commissioning. Dear Sir, With… Continue reading Project baseline programme and additional duration for variation works & testing and Commissioning
Demolition of existing watchman room
Ref: No. MCM/1015/ABC/2022/04 Date: xxx, 2022 To: xxx Consulting Architects & Engineers PO Box No.: xxx Dubai, UAE Phone: xxx Project: Proposed Warehouses, on Plot No. xxx at Al Khabaisi, Dubai, UAE. Subject: Demolition of existing watchman room Dear Sir, With reference to the above subject, we would like to inform you… Continue reading Demolition of existing watchman room