Hazard Meaning and Definition

ACTIVITY HAZARD ANALYSIS Subsurface Deglottalization of Infrastructure

HAZARD / WORK:       Sub-Surface Delethalisation of Infrastructure LOCATION:______________________________________________ H=High                        M=Medium                   L=Low                                Significant Risks H M L   Who May Be Harmed 1 Work related upper limb disorders. Musculoskeletal injuries. Cuts, abrasions. Foot / toe injuries     X       2 Dehydration, heat exhaustion. Heat stroke     X   Employees…………………… X 3 Cuts, […]

ACTIVITY HAZARD ANALYSIS Subsurface Deglottalization of Infrastructure Read Post »

HDPE PIPE BUTT WELDING PROCEDURES

Method Statement for Grouting of Pipes in Stormwater Single and Double Pipe Catchpits

CONTENTS Purpose Scope of Work Definitions References Materials Tools, Plant  & Equipment Safety Prior Activities Procedure Responsibilities Attachments Purpose 1.1       To ensure that the grouting of pipes in stormwater catchpits is executed safely and in accordance with the contract requirements and that all quality assurance/ control activities are conducted in a systematic manner, works are

Method Statement for Grouting of Pipes in Stormwater Single and Double Pipe Catchpits Read Post »

Hazard Meaning and Definition

JOB HAZARD ANALYSIS Grouting of Pipes in Stormwater Single and Double Pipe Catchpits

The responsible person is to ensure the control measures below are in place before the activity is carried out   TASK: Grouting of Pipes in Stormwater Single and Double Pipe Catchpits (Types 1, 2 & 3)     Date:19 December 2006 No ACTIVITY HAZARD RISK CONTROL MEASURES TO MINIMISE / ELIMINATE RISK RESPONSIBLE PERSON 1

JOB HAZARD ANALYSIS Grouting of Pipes in Stormwater Single and Double Pipe Catchpits Read Post »

Method Statement For GRP LAMINATION

ACTIVITY HAZARD ANALYSIS Grouting of Pipes in Stormwater Single and Double Pipe Catchpits

HAZARD / WORK:       Grouting of Pipes in Stormwater Single and Double Pipe Catchpits (Types 1, 2 & 3) LOCATION: ______________________________________________ H=High                        M=Medium                   L=Low                                Significant Risks H M L   Who May Be Harmed 1 Work related upper limb disorders. Musculoskeletal injuries. Cuts, abrasions. Foot / toe injuries     X       2

ACTIVITY HAZARD ANALYSIS Grouting of Pipes in Stormwater Single and Double Pipe Catchpits Read Post »

Method Statement For GRP LAMINATION

Method Statement For GRP LAMINATION

CONTENTS Purpose Scope of Work Definitions References Materials Tools, Plant  & Equipment Safety Prior Activities Procedure Responsibilities Attachments Purpose 1.1       To ensure that the GRP lamination in sewage manhole and inspection chamber is executed safely and in accordance with the contract requirements and that all quality assurance/ control activities are conducted in a systematic manner,

Method Statement For GRP LAMINATION Read Post »

ACTIVITY HAZARD ANALYSIS Application of ISOLA N-S Grout

Method Statement for Application of ISOLA N-S Grout Material

CONTENTS Purpose Scope of Work Definitions References Materials Tools, Plant  & Equipment Safety Prior Activities Procedure Responsibilities Attachments Purpose 1.1       To ensure that the application of ISOLA N-S Grout Material is executed safely and in accordance with the contract requirements and that all quality assurance/ control activities are conducted in a systematic manner, works are

Method Statement for Application of ISOLA N-S Grout Material Read Post »

ACTIVITY HAZARD ANALYSIS Application of ISOLA N-S Grout

ACTIVITY HAZARD ANALYSIS Application of ISOLA N-S Grout

HAZARD / WORK: Application of ISOLA N-S Grout LOCATION:______________________________________________ H=High                        M=Medium                   L=Low                                Significant Risks H M L   Who May Be Harmed 1 Work related upper limb disorders. Musculoskeletal injuries. Cuts, abrasions. Foot / toe injuries     X       2 Dehydration, heat exhaustion. Heat stroke     X   Employees…………………… X 3

ACTIVITY HAZARD ANALYSIS Application of ISOLA N-S Grout Read Post »

Bituminous-Membrane-Waterproofing

Method Statement for Placing of Surface Protection Material

CONTENTS Purpose Scope of Work Definitions References Materials Tools, Plant  & Equipment Safety Prior Activities Procedure Responsibilities Attachments 1.0       Purpose To ensure that placing of surface protection material and related activities are executed safely and in accordance with the contract requirements and that all quality assurance/control activities are conducted in a systematic manner, works are

Method Statement for Placing of Surface Protection Material Read Post »