CARPET FLOORING WORKS 1.0 OBJECTIVE 1.1 To define the requirements and procedure for carpet flooring works under the contract no GTC.101/ED/01 Engineering, Procurement, Installation and Commissioning (EPIC) of Ras Laffan Utilization Project –Buildings and utilities and support service Phase 1-Utilities. 2.0 SCOPE 2.1 Applicable to all the office buildings at Service Base Area, Service Berth… Continue reading Carpet flooring Method statement
Month: October 2022
Block work-Method statement
CONCRETE BLOCK WORK 1.0 OBJECTIVE 1.1 Is to define the requirements for supply and laying of concrete block work for the buildings and utilities under the contract no GTC.101/ED/01 Engineering, Procurement, Installation and Commissioning (EPIC) of Ras Laffan Utilization Project –Buildings and utilities and support service Phase 1-Utilities. 2.0 SCOPE 2.1 Concrete block work for… Continue reading Block work-Method statement
Toolbox talks for Box culvert and excavations
Toolbox talks:-Manual HandlingCOSHHExcavationsNOISE Manual Handling We lift, manoeuvre and handle goods every day of our lives in one way or another, not just whilst at work but also during social activities such as gardening, DIY, shopping and sport. A bad back or injury today, could, and regularly does, turn into a painful back problem for… Continue reading Toolbox talks for Box culvert and excavations
Method Statement for Casting of Blinding Concrete for Box Culvert and Installation of Precast Box Culvert Units
TABLE OF CONTENTS Purpose Scope of Work Definitions References Materials Plant & Equipment Safety Prior Activities Procedure Responsibilities Attachments 1. Purpose 1.1 To ensure that the Blinding of Box Culverts and Installation of Precast Box Culvert units are executed safely and in accordance with the contract requirements and that all quality assurance/ control activities are… Continue reading Method Statement for Casting of Blinding Concrete for Box Culvert and Installation of Precast Box Culvert Units
JOB HAZARD ANALYSIS Casting Blinding Concrete and Installation of Precast Box Culvert Units
TASK: Casting Blinding concrete and Installation of Precast Box culverts Date:5th Aug 2006 No ACTIVITY HAZARD RISK CONTROL MEASURES TO MINIMISE / ELIMINATE RISK RESPONSIBLE PERSON 1 Service location survey Manual handling operations (MHO’s) Work related upper limb disorders. Musculoskeletal injuries. Cuts, abrasions. Foot / toe injuries Maximum use of equipment… Continue reading JOB HAZARD ANALYSIS Casting Blinding Concrete and Installation of Precast Box Culvert Units
ACTIVITY HAZARD ANALYSIS Casting Blinding Concrete and Installation of Precast Box Culvert Units
HAZARD / WORK: Casting Blinding Concrete and Installation of Precast Box Culvert Units LOCATION:______________________________________________ H=High M=Medium L=Low Significant Risks H M L Who May Be Harmed 1 Work related upper limb disorders. Musculoskeletal injuries. Cuts, abrasions. Foot / toe injuries X 2 Dehydration, heat exhaustion. Heat stroke … Continue reading ACTIVITY HAZARD ANALYSIS Casting Blinding Concrete and Installation of Precast Box Culvert Units
Airside Operational Area Safety Plan Construction of Taxiway Lima Intersection with Existing Runway
CONTENTS Purpose Scope of Work / Airside Operational Restrictions Definitions References Materials Plant and Equipment Safety and Security Responsibilities Annex A: Air Traffic Control (ATC) – Runway Curfew Procedures Attachments Purpose Aviation and Operational Safety during construction is the primary consideration in developing a work plan for the Pavement and Utility Infrastructure Construction at the… Continue reading Airside Operational Area Safety Plan Construction of Taxiway Lima Intersection with Existing Runway
Toolbox talks for Installation of Communication Sub-Ducts
Toolbox talks:-Manual HandlingCOSHH Manual Handling We lift, manoeuvre and handle goods every day of our lives in one way or another, not just whilst at work but also during social activities such as gardening, DIY, shopping and sport. A bad back or injury today, could, and regularly does, turn into a painful back problem… Continue reading Toolbox talks for Installation of Communication Sub-Ducts
Method Statement for Installation of Communication Sub-Ducts
CONTENTS Purpose Scope of Work Definitions References Materials Tools, Plant & Equipment Safety Prior Activities Procedure Responsibilities Attachments Purpose 1.1 To ensure that the installation of communication sub-ducts and related activities are executed safely and in accordance with the contract requirements and that all quality assurance/ control activities are conducted in a systematic manner, works… Continue reading Method Statement for Installation of Communication Sub-Ducts
JOB HAZARD ANALYSIS Installation of Communication Sub-Ducts
The responsible person is to ensure the control measures below are in place before the activity is carried out TASK: Installation of Communication Sub-Ducts Date: October 29th, 2007 No ACTIVITY HAZARD RISK CONTROL MEASURES TO MINIMISE / ELIMINATE RISK RESPONSIBLE PERSON 1 Laying Sub-Ducts Use of hand tools Cuts, abrasions, broken bones,… Continue reading JOB HAZARD ANALYSIS Installation of Communication Sub-Ducts