Remove Contractor from DDA Portal

Request to remove Contractor in the portal under Plot No. xxx project

Date: xx Ref.: xx Total Pages: 1 To        :           xxx Dubai, UAE Project:           xxx, Subject:           Request to remove Contractor in the portal under Plot No. xxx project Dear Sir/Madam, Reference to the subject and captioned project, we urge to remove our name xxx in the portal under the above mention project. attached herewith is the Termination […]

Request to remove Contractor in the portal under Plot No. xxx project Read Post »

Plaster Work

PLASTER WORK METHOD OF STATEMENT

CONTENTS PURPOSE SCOPE REFERENCES DEFINITIONS RESPONSIBILITIES MATERIALS & EQUIPMENT PROCEDURE PURPOSE: The purpose of this method statement is to define the procedure for internal and external plaster work in accordance with the requirement specified in the relevant specification procedures and drawing throughout the progress of the work SCOPE: This method statement applies to the application

PLASTER WORK METHOD OF STATEMENT Read Post »

Block work

BLOCK WORK METHOD OF STATEMENT

TABLE OF CONTENTS 1.           PURPOSE. 2 2.           SCOPE. 2 3.           DEFINITIONS. 2 4.           REFERENCE DOCUMENTS. 2 5.           DUTIES AND RESPONSIBILITIES. 3 6.           RESOURCES. 3 6.1.       Human Resource.. 3 6.3.       Material 4 7.2.       Sequence of Construction. 5 10.1…. Risk Assessment Analysis 7   1.           PURPOSE The purpose of this Work Method Statement for Block Works (Concrete

BLOCK WORK METHOD OF STATEMENT Read Post »

Fixing of dowels

METHOD STATEMENT FOR FIXING DOWELS

INTRODUCTION:- The project is Consist “Proposed B+G+1 Villa on Plot No. 3320300 at Jumeirah First, Dubai for “Mr. Faisal Abdulla Saleh Al Gurg” THE METHOD FOR DOWELS ABOVE PANTRY AT GROUND FLOOR IS AS FOLLOWS: – HOLES PREPARATION:- Holes shall be drill up to a depth of 200mm/150mm on existing concrete beam/wall sides as recommended

METHOD STATEMENT FOR FIXING DOWELS Read Post »