Undertaking Letter for the MS Ceiling Frame

Undertaking Letter for the MS Ceiling Frame

Our Ref: xxx

Date: xxx

To                    :           xxx Mideast

                                   Oman Branch

Attention          :           Mr. xxx Sing

Project             :           xxx Building, Oman

Subject            :           Undertaking Letter for the MS Ceiling Frame       

To whom so ever it may concern,

Xxx fabricate all the steel frames within our facility as per the design requirement incorporating the access panels opening in the pods. This is not considered as a structural element in any case because there is no load coming in these ceiling frames. Xxx are using the welded steel frame for the pods because this gives the required rigidity for the pods during transportation and lifting.

However Xxx have conducted tests internally as a part of Quality assurance on which can take the responsibility up to 200KG dead load above the pods which means 2 person laying down on top of the pod for any future maintenance if required. We hope this is clear and looking forward to receive your approval on our submittal Ref No: IPA-SPOSO24-A0-C-MAS-0003

Thanks,

On behalf of Xxx LLC

xxx

Project Manager