Date: xxx
Ref: xxx
Kind Attn :Mr. xxx
Project: 2B + G + 14+ Lower Roof Hotel Building on Plot No. xxx at Al Barsha 1st, Dubai
Project : 2B + G + 14+ Lower Roof Hotels Building on Plot No. 373-1297 at Barsha,Dubai
Sub : To confirm that drive way design to take load of Crane and transformer during installation as well as during emergency in future.
Dear Sir
With reference to above, we would like to inform you that Dewa team visited on 6.7.2017 to review our transformer shifting issue and they inform the following.
- They need confirmation that our drive way from RMU room to substation design to bear the over burden weight of Crane plus transformer.( approximate +/-20T)
- They will inform us that Crane load may be 15 tones or more plus almost 5 tones transfer.Still exact load they did not inform us.
Mean time they also discuss in case of emergency they will park the vehicle mounted transformer on the drive way infront of substation.
This is for your kind information and to, review the issue in advance.
Regards,
For xxx Contracting L.L.C.
xxx
Project Manager