Tile Status and balance tile requirement by in cooperating the additional realistic wastage in toilet floor and wall.

Tile Status and balance tile requirement by in cooperating the additional realistic wastage in toilet floor and wall.

Date: xxx

Ref: CC/269/CM/68

To                          : M/s. xxx, Dubai, UAE

Kind Attn              : Ms. xxx

Project            : 2B + G + 14+ Lower Roof Hotel Building on Plot No. 373-1297 at Al        Barsha 1st, Dubai U.A.E.

Subject                 :  Tile Status and balance tile requirement by in cooperating the additional realistic wastage in toilet floor and wall.

Dear Madam,

With reference to the above, herewith attaching the Tile Status as follows:

1.  LGF EXPORTER (BY MET) (LGF Exporter) – Page 1

 This is for your kind information and record to do the needful.

Attachment –A3 SHEET PAGE 1/1

Thanking you,

For xxx Contracting L.L.C

xxx

Project Manager