The Document transmission
Date: xxx
Ref: xxx
To : M/s. xxx Interiors
Project : 2B + G + 14 + Lower Roof Hotels Building on Plot No. xxx at Barsha, Dubai
Subject: The Document transmission
Dear Sir,
With reference to the above subject, we are handling our following documents”
- Tender Addendum (1 of 2) 1 set
- Tender Addendum (2 of 2) 1 set
- Volume 1 Subcontract Condition1 1 set
- Volume 1-A contents LPO nomination 3 sets
and employers letter including special
condition.
- We are also attaching original letter sent dated 13.05.17 with ref. no. CC/MAKSTYLO/003 and we are awaiting for reply for the same.
The one-side document to be signed and two more sets to be prepared and to be delivered to our office site. The Volume 1-A, we are already given 3-sets to be stamped and signed and written back two copies.
Request to do needful and do not hesitate to call back for any product queries or assistance.
Regards,
For xxx Contracting L.L.C
xxx
Project Manager
Md Abu Zaed Khan