Regarding serious issue of reduction of slump at pumping point and slab level as well as blockage of the pipeline and other issues

Date:xxx Ref No. xxx To                    : M/s xxx Project             :2B + G + 14+ Lower Roof Hotels Building on Plot No. xxx at Barsha,  Dubai Subject           : Regarding serious issue of reduction of slump at pumping point and slab level as well as blockage of the pipeline and other issues Dear Sir, With reference to the above, we would like […]