Regarding serious issue of reduction of slump at pumping point and slab level as well as blockage of the pipeline and other issues

Date:xxx Ref No. xxx To                    : M/s xxx Project             :2B + G + 14+ Lower Roof Hotels Building on Plot No. xxx at Barsha,  Dubai Subject           : Regarding serious issue of reduction of slump at pumping point and slab level as well as blockage of the pipeline and other issues Dear Sir, With reference to […]

Regarding serious issue of reduction of slump at pumping point and slab level as well as blockage of the pipeline and other issues Read Post ยป