Method Statement Title: Installation of Low Voltage Panels (LVP’s).

1.0       Scope Note : A separate Method Statement ref. ETA/MS/E-29 shall be submitted for Testing & Commissioning. 2.0       Material 3.0       Applicable Location 4.0       Method Note: L.V. Panels will be offered for factory inspection/witness by Design Consultant prior to material dispatch 4.2       Installation 6.0       Records             6.1       QC Inspection Check List. 7.0       Attachment

Method Statement Title: Installation of Low Voltage Panels (LVP’s). Read Post »