Method Statement Title: Installation of Generator and ATS.
1.0 Scope Note : A separate Method Statement Ref. : ETA/MS/E-039 shall be submitted for Testing & Commissioning of Generator and ATS. 2.0 Material 3.0 Applicable Location 4.0 Method 4.2.1.1 Installation Procedure: 4.2.2 ATS : 5.0 Records 6.1 Inspection Check List for Generator & ATS.
Method Statement Title: Installation of Generator and ATS. Read Post ยป
