Method Statement Title: Chlorination, Disinfection and Commissioning of Domestic Water System

Method Statement Title: Chlorination, Disinfection and Commissioning of Domestic Water System 1.0     Scope :             To describe the method of flushing, Disinfecting and chlorination of domestic water System as per specification Section 15400 Clause 3.07. 2.0     Material : 3.0     Applicable locations and Description : 4.0     Method :  Refer enclosed details.

Method Statement Title: Chlorination, Disinfection and Commissioning of Domestic Water System Read Post »