Method Statement Title: Chlorination, Disinfection and Commissioning of Domestic Water System
Method Statement Title: Chlorination, Disinfection and Commissioning of Domestic Water System 1.0 Scope : To describe the method of flushing, Disinfecting and chlorination of domestic water System as per specification Section 15400 Clause 3.07. 2.0 Material : 3.0 Applicable locations and Description : 4.0 Method : Refer enclosed details.
