Main contractors terms and conditions for Painting works LPO

Main contractors terms and conditions for LPO Ref. xxx                                                                                          Date: xxx Project: 2B+G+14F+Lower Roof Hotel Building Plot no: xxx at Al Barsha 1 Client: Mr. xxx Consultant: M/S xxx Consulting Architects and Engineers Scope The measurement at site, surface applied with deduction of all openings. (Both side at the doors and one side of the window) The undulation from 1mm+/-2mm […]