Dr
Date: xxx
Ref. xxx
To:
M/s. xxx Consulting Architects and Engineers
Dubai, UAE
Kind Attn: Mr. xxx
Project: 2B + G + 14+ Lower Roof Hotels Building on Plot No. xxx at Barsha, Dubai.
Subject: Shop Drawing for Drainage Manhole Excavation
Dear Sir,
With reference to the above , we are submitting Shop Drawing for Manhole Area Excavation by maintaining uniform raft thickness as well reinforcement detail also i.e, 1.5m below the manhole section.
Kindly review the same and this section has been prepared by maintaining the raft thickness as explained above and as shown in the drawing section M-M attached herewith
Meantime, we are attaching for your reference the DM approved drawing for other project and we use as a template to prepare over the shop drawing.
So kindly review and if required submit to Dubai Municipality for approval along submission of DM
Regards,
For xxx Contracting L.L.C
xxx
Project Manager