ACTIVITY HAZARD ANALYSIS Casting Blinding Concrete and Installation of Precast Box Culvert Units

ACTIVITY HAZARD ANALYSIS Construction of Open Concrete Formed Channel

HAZARD / WORK: Casting Blinding Concrete and Installation of Precast                                          Box Culvert Units LOCATION:______________________________________________ H=High                        M=Medium                   L=Low                                Significant Risks H M L   Who May Be Harmed 1 Work related upper limb disorders. Musculoskeletal injuries. Cuts, abrasions. Foot / toe injuries     X       2 Dehydration, heat exhaustion. Heat stroke  … Continue reading ACTIVITY HAZARD ANALYSIS Casting Blinding Concrete and Installation of Precast Box Culvert Units

Airside Operational Area Safety Plan Construction of Taxiway Lima Intersection with Existing Runway

Risk Assessment Procedure Step wise Guide

CONTENTS Purpose Scope of Work / Airside Operational Restrictions Definitions References Materials Plant and Equipment Safety and Security Responsibilities Annex A:  Air Traffic Control  (ATC) – Runway Curfew Procedures Attachments Purpose Aviation and Operational Safety during construction is the primary consideration in developing a work plan for the Pavement and Utility Infrastructure Construction at the… Continue reading Airside Operational Area Safety Plan Construction of Taxiway Lima Intersection with Existing Runway

Toolbox talks for Installation of Communication Sub-Ducts

JOB HAZARD ANALYSIS TOOLBOX TALKS ATTACHMENTS Casting Blinding Concrete for Foundation Building Structures

Toolbox talks:-Manual HandlingCOSHH   Manual Handling We lift, manoeuvre and handle goods every day of our lives in one way or another, not just whilst at work but also during social activities such as gardening, DIY, shopping and sport. A bad back or injury today, could, and regularly does, turn into a painful back problem… Continue reading Toolbox talks for Installation of Communication Sub-Ducts

JOB HAZARD ANALYSIS Installation of Communication Sub-Ducts

Hazard Meaning and Definition

The responsible person is to ensure the control measures below are in place before the activity is carried out   TASK: Installation of Communication Sub-Ducts     Date: October 29th, 2007 No ACTIVITY HAZARD RISK CONTROL MEASURES TO MINIMISE / ELIMINATE RISK RESPONSIBLE PERSON 1 Laying Sub-Ducts Use of hand tools Cuts, abrasions, broken bones,… Continue reading JOB HAZARD ANALYSIS Installation of Communication Sub-Ducts

ACTIVITY HAZARD ANALYSIS Installation of Communication Sub-Ducts

Risk Assessment Procedure Step wise Guide

HAZARD / WORK:       Installation of Communication Sub-Ducts LOCATION: ______________________________________________ H=High                        M=Medium                   L=Low                                Significant Risks H M L   Who May Be Harmed 1 Work related upper limb disorders. Musculoskeletal injuries. Cuts, abrasions. Foot / toe injuries     X       2 Dehydration, heat exhaustion. Heat stroke     X   Employees…………………… X 3… Continue reading ACTIVITY HAZARD ANALYSIS Installation of Communication Sub-Ducts

Toolbox talks for Rendering works

JOB HAZARD ANALYSIS TOOLBOX TALKS ATTACHMENTS Casting Blinding Concrete for Foundation Building Structures

Toolbox talks:-Manual HandlingCOSHHNOISE Manual Handling We lift, manoeuvre and handle goods every day of our lives in one way or another, not just whilst at work but also during social activities such as gardening. A bad back or injury today, could, and regularly does, turn into a painful back problem for life! Lifting incorrectly could… Continue reading Toolbox talks for Rendering works

JOB HAZARD ANALYSIS Rendering Works for Buildings

The responsible person is to ensure the control measures below are in place before the activity is carried out   TASK: Rendering Works for Buildings     Date: 26th September 2007 No ACTIVITY HAZARD RISK CONTROL MEASURES TO MINIMISE / ELIMINATE RISK RESPONSIBLE PERSON 1 Rendering Works Use of hand tools Cuts, abrasions, broken bones,… Continue reading JOB HAZARD ANALYSIS Rendering Works for Buildings

ACTIVITY HAZARD ANALYSIS Rendering Works for Buildings

HAZARD / WORK: Rendering Works for Buildings LOCATION: ______________________________________________ H=High                        M=Medium                   L=Low                                Significant Risks H M L   Who May Be Harmed 1 Work related upper limb disorders. Musculoskeletal injuries. Cuts, abrasions. Foot / toe injuries     X       2 Dehydration, heat exhaustion. Heat stroke     X   Employees…………………… X 3… Continue reading ACTIVITY HAZARD ANALYSIS Rendering Works for Buildings

Toolbox talks for excavation works

JOB HAZARD ANALYSIS TOOLBOX TALKS ATTACHMENTS Casting Blinding Concrete for Foundation Building Structures

Toolbox talks:-Manual HandlingCOSHHExcavationsNOISE Manual Handling We lift, manoeuvre and handle goods every day of our lives in one way or another, not just whilst at work but also during social activities such as gardening. A bad back or injury today, could, and regularly does, turn into a painful back problem for life! Lifting incorrectly could… Continue reading Toolbox talks for excavation works

JOB HAZARD ANALYSIS Block Works for Building

Hazard Meaning and Definition

  TASK:  Method Statement for Block Works for Building   Date: July 14, 2007 No ACTIVITY HAZARD RISK CONTROL MEASURES TO MINIMISE / ELIMINATE RISK RESPONSIBLE PERSON 1 Service location survey Manual handling operations (MHO’s) Work related upper limb disorders. Musculoskeletal injuries. Cuts, abrasions. Foot / toe injuries Maximum use of equipment to reduce need… Continue reading JOB HAZARD ANALYSIS Block Works for Building