Sale!

Resources Loaded Construction Programme | G+1 Villa Cost &

Rated 5.00 out of 5 based on 1 customer rating
(2 customer reviews)

Original price was: 25,00 $.Current price is: 9,00 $.

Professional resources loaded construction programme for G+1 Villa with cost, manpower, equipment in .xer format. Includes S-curve, cash flow, histogram.

Guaranteed Safe Checkout

Resources Loaded Construction Programme for G+1 Villa

This professional resources loaded construction programme delivers a detailed L4 baseline schedule with cost, manpower, and plant & equipment fully loaded for a Ground + First Floor Villa (Duplex House). The programme follows logical construction sequence with comprehensive WBS structure.

What Is Included in This Package

  • Primavera P6 Programme (.xer) — Resources loaded baseline schedule with cost, manpower, and equipment
  • S-Curve & Cash Flow — Professional format with cumulative cost and progress curves
  • Manpower Histogram — Trade-wise resource loading with peak demand analysis
  • Plant & Equipment Schedule — Equipment utilization across project timeline
  • Month-wise Activity & KPIs — MS Excel with major milestones and performance indicators

High-Level WBS Structure

WBS Level Scope
1.0 Pre-Commencement: LOA, Contract, NOC, Approved Drawings, Commencement Letter
2.0 Engineering Submissions & Approvals (Subcontractor Pre-qual, PS/PC Items, Materials, Shop Drawings)
3.0 Engineering Procurement (Civil & MEP Long Lead Items)
4.0 Construction Works: Substructure, Superstructure, Finishes (Internal/External)
5.0 MEP Works: Power & Lighting, ELV/Home Automation, Water Supply, Drainage, HVAC, Fire Systems
6.0 Completion: Substantial Completion, Authority Approval, Snagging, Testing & Commissioning
7.0 Handover to Client

Key Features

  • Cost-Loaded: Every activity linked to BOQ items with cost breakdown
  • Manpower-Loaded: Trade-wise histograms showing peak workforce requirements
  • Equipment-Loaded: Plant & machinery utilization schedules
  • L4 Detail: Granular activities suitable for monthly progress reporting
  • Primavera .xer Format: Import-ready for P6, compatible with progress updating

Who Needs This Programme

  • Planning Engineers preparing baseline submissions
  • Project Managers tracking cost & resource performance
  • Quantity Surveyors validating cash flow forecasts
  • Contractors bidding G+1 villa projects
  • Consultants reviewing contractor programmes

Related Resources

Instant Digital Download

Upon purchase, receive immediate access to .xer Primavera file, Excel KPIs, and PDF documentation. No shipping, no waiting.


Part of the Engineers Blog Construction Programme Series. Used on GCC villa projects since 2022.

2 reviews for Resources Loaded Construction Programme | G+1 Villa Cost &

  1. Rated 5 out of 5

    Ahmed K. (verified owner)

    Excellent quality template, very professional and well-structured.

  2. Rated 5 out of 5

    Mohammed S. (verified owner)

    Great document, saved me a lot of time on my project.

Add a review

Your email address will not be published. Required fields are marked *

Resources loaded construction programme for G+1 Villa - Primavera P6 .xer with cost manpower equipmentResources Loaded Construction Programme | G+1 Villa Cost &
Original price was: 25,00 $.Current price is: 9,00 $.
Scroll to Top