Sale!

EOT Claims & Prolongation Cost Computation Tool + Excel

Rated 5.00 out of 5 based on 2 customer ratings
(3 customer reviews)

Original price was: 35,00 $.Current price is: 15,00 $.

Extension of Time Claims and Prolongation Cost Computation template in professional printed format with Primavera professional file.

Guaranteed Safe Checkout

Professional EOT Claims & Prolongation Cost Computation Guide

This comprehensive guide provides a professional Extension of Time (EOT) claims template and prolongation cost computation methodology for construction projects. Includes both professional printed format narration and Primavera P6 professional format files. The EOT claims prolongation cost computation framework follows industry-standard Time Impact Analysis techniques.

What’s Included in This Package

  • EOT Claims Narrative Template — Professional printed format with detailed delay analysis structure
  • Primavera P6 Professional Files — Time Impact Analysis (TIA) ready schedules
  • Prolongation Cost Calculation Excel Sheet — MS Excel format with formulas for overheads, labor, equipment, and materials
  • Real Project Case Study — Actual claim submitted to consultant and approved conditionally

Methodology: Time Impact Analysis (TIA) for EOT Claims

The guide uses the Time Impact Analysis technique to determine delay impact on the critical path. This industry-standard method inserts delay activities into the current schedule to quantify time extension entitlement. The EOT claims prolongation cost computation process integrates schedule delay analysis with financial impact assessment.

Prolongation Cost Components Covered

Cost Category Calculation Basis
Head Office Overheads Percentage of contract value / Emden Formula
Site Overheads Daily site running costs × extension days
Labor & Staff Key personnel daily rates × extension period
Plant & Equipment Standing charges + operating costs
Materials & Storage Escalation + storage charges

Who Needs This EOT Claims & Prolongation Cost Computation Guide

  • Planning Engineers preparing EOT submissions
  • Contractors claiming prolongation costs
  • Quantity Surveyors validating cost claims
  • Project Managers reviewing consultant responses
  • Construction Lawyers supporting delay disputes

Related Resources

Instant Digital Download

Upon purchase, you receive immediate access to all template files (PDF, Excel, .xer Primavera formats). No shipping, no waiting.


Part of the Engineers Blog Construction Document Template Series. Trusted by planning engineers across GCC projects since 2022.

3 reviews for EOT Claims & Prolongation Cost Computation Tool + Excel

  1. Rated 5 out of 5

    Ahmed K. (verified owner) –

    Excellent quality template, very professional and well-structured.

  2. Rated 5 out of 5

    Mohammed S. (verified owner) –

    Great document, saved me a lot of time on my project.

  3. Rated 4 out of 5

    John D. (verified owner) –

    Very comprehensive and easy to customize. Highly recommended.

Add a review

Your email address will not be published. Required fields are marked *

Critical PathEOT Claims & Prolongation Cost Computation Tool + Excel
Original price was: 35,00 $.Current price is: 15,00 $.
Scroll to Top