METHOD STATEMENT FOR LIGHTING FIXTURES INSTALLATION

Urgent Delivery for Substation Light Fitting Material.

Ref: xxx Date: xxx To: P.O Box: xxx Tel: xxx, Fax: xxx Project                     : 2B+G+7 Residential Building, ICP1 CBD C01, International City Client                       : M/s xxx Properties Ltd Consultant             : M/s xxx Engineering Consultant. Subject: Urgent Delivery for Substation Light Fitting Material. Dear Sir With reference to the above mentioned subject, we would like to […]

Urgent Delivery for Substation Light Fitting Material. Read Post »

Roof Steel Structure

Roof Steel Structural Drawings and Calculation.

Ref: xxx Date: xxx To: P.O Box: xxx Tel: xxx, Fax: xxx Project                     : 2B+G+7 Residential Building, ICP1 CBD C01, International City Client                       : M/s xxx Properties Ltd Consultant             : M/s xxx Engineering Consultant. Subject: Roof Steel Structural Drawings and Calculation. Dear Sir With reference above mentioned subject, we would like to inform you that,

Roof Steel Structural Drawings and Calculation. Read Post »

delivery of Tiles and cheque copy.

submission of CFD analysis (soft copy) for Basement 1 & 2.

Ref: xxx Date: xxx To: P.O Box: xxx Tel: xxx, Fax: xxx Project                     : 2B+G+7 Residential Building, ICP1 CBD C01, International City Client                       : M/s xxx Properties Ltd Consultant             : M/s xxx Engineering Consultant. Subject: submission of CFD analysis (soft copy) for Basement 1 & 2. Dear Sir, With reference to the above mentioned subject,

submission of CFD analysis (soft copy) for Basement 1 & 2. Read Post »

Garbage chute

Clearance for Garbage the chute work

Ref: xxx Date: xxx To: P.O Box: xxx Tel: xxx, Fax: xxx Project                     : 2B+G+7 Residential Building, ICP1 CBD C01, International City Client                       : M/s xxx Properties Ltd Consultant             : M/s xxx Engineering Consultant. Subject: Clearance for Garbage the chute work. Dear Sir With reference to the above mentioned subject, we would like to inform

Clearance for Garbage the chute work Read Post »

3-tips-for-Fire-Pump

Risk assessment submission for fire department.

Ref: xxx Date: xxx To: P.O Box: xxx Tel: xxx, Fax: xxx Project                     : 2B+G+7 Residential Building, ICP1 CBD C01, International City Client                       : M/s xxx Properties Ltd Consultant             : M/s xxx Engineering Consultant. Subject: Risk assessment submission for fire department. Dear Sir With reference to the above mentioned subject, regarding the gas drawing consultant

Risk assessment submission for fire department. Read Post »

Door Frame installation

Request for the wooden frame installation

Ref: xxx Date: xxx To: P.O Box: xxx Tel: xxx, Fax: xxx Project                     : 2B+G+7 Residential Building, ICP1 CBD C01, International City Client                       : M/s xxx Properties Ltd Consultant             : M/s xxx Engineering Consultant. Subject: Request for the wooden frame installation Dear Sir With reference to the above mentioned subject, we would like to inform

Request for the wooden frame installation Read Post »

Tile

Requirement for the balance area tile.

Ref: xxx Date: xxx To: P.O Box: xxx Tel: xxx, Fax: xxx Project                     : 2B+G+7 Residential Building, ICP1 CBD C01, International City Client                       : M/s xxx Properties Ltd Consultant             : M/s xxx Engineering Consultant. Subject         : Requirement for the balance area tile. Dear Sir With reference to the above mentioned subject, we would like to

Requirement for the balance area tile. Read Post »

Submission of the GRC works Quotation from Three potential Contractors

Ref: xxx Date: xxx To: P.O Box: xxx Tel: xxx, Fax: xxx Project                     : 2B+G+7 Residential Building, ICP1 CBD C01, International City Client                       : M/s xxx Properties Ltd Consultant             : M/s xxx Engineering Consultant. Subject   : Submission of the GRC Quotation from Three potential      Contractors for GRC work at above mention project Dear Sir, With

Submission of the GRC works Quotation from Three potential Contractors Read Post »

concrete strength

Lower Roof 28 Days Cube Test Report.

Ref: xxx Date: xxx To: P.O Box: xxx Tel: xxx, Fax: xxx Project                     : 2B+G+7 Residential Building, ICP1 CBD C01, International City Client                       : M/s xxx Properties Ltd Consultant             : M/s xxx Engineering Consultant. Subject: Lower Roof 28 Days Cube Test Report. Dear Sir I hereby confirm and undertake that the Lower roof 28 days

Lower Roof 28 Days Cube Test Report. Read Post »

Contract Documents

Notice for termination of contract, recovery of losses and your contract closer or settlement of any claim

Ref: xxx Date: xxx To: P.O Box: xxx Tel: xxx, Fax: xxx Project                     : 2B+G+7 Residential Building, ICP1 CBD C01, International City Client                       : M/s xxx Properties Ltd Consultant             : M/s xxx Engineering Consultant. Subject: Regarding the Notice for termination of contract, recovery of losses                 and your contract closer or settlement of any claim        

Notice for termination of contract, recovery of losses and your contract closer or settlement of any claim Read Post »