Very serious concern and need senior foreman from MEP dept

Date: xxx Ref. xxx Kind Attn:     Mr. xxx Project:            2B + G + 14+ Lower Roof Hotels Building Plot No.:          xxx at Al Barsha 1st, Dubai Subject          :  Very serious concern and need senior foreman from MEP dept Dear Mr.Tahir, With reference to the above, we would like to inform you as we notice that your engineers are busy […]

Date: xxx Ref. xxx Kind Attn:     Mr. xxx Project:            2B + G + 14+ Lower Roof Hotels Building Plot No.:          xxx at Al Barsha 1st, Dubai Subject          :  Instruction to review the swimming pool  drawings and claim for the variation. Dear MEP team, With reference to the above, we would like to inform you that the variation for kitchen […]

REQUEST FOR THE FEEDBACK OF ID DRAWINGS

Date: xxx Ref. xxx Kind Attn:     Mr. xxx Project:            2B + G + 14+ Lower Roof Hotels Building Plot No.:          xxx at Al Barsha 1st, Dubai Subject          :  REQUEST FOR THE FEEDBACK OF ID DRAWINGS Dear MEP team, With reference to the above, we would like to inform you that we have submitted ID drawings for first floor and […]

Protocol for Permission from QA/QC Division and Time for Approval

Date: xxx Ref. xxx Kind Attn:     Mr. xxx Project:            2B + G + 14+ Lower Roof Hotels Building Plot No.:          xxx at Al Barsha 1st, Dubai Subject          :  Protocol for Permission from QA/QC Division and Time for Approval Dear Mr. Teja, The protocol of cutting/changing/ core cutting /breaking of wall at any part of the project, you must provide […]

Regarding follow up of pending work

Date: xxx Ref. xxx Kind Attn:     Mr. xxx Project:            2B + G + 14+ Lower Roof Hotels Building Plot No.:          xxx at Al Barsha 1st, Dubai Subject:         Regarding follow up of pending work Dear Tahir, With ref. to above, the following are to be submitted to consultant. Inclusion/ exclusion items to be submitted Long lead item must be submitted […]

Requirement of drawings for mock up room

Date: xxx Ref. xxx Kind Attn:     Mr. xxx Project:            2B + G + 14+ Lower Roof Hotels Building Plot No.:          xxx at Al Barsha 1st, Dubai Subject:         Requirement of drawings for mock up room Dear Tahir, With ref. to above, we require total number of MEP drawings which include water supply, exhaust, any ducts or machine and AC drawings […]

Issue regarding non availability of lights at site for working during evening

Date: xxx Ref. xxx Kind Attn:     Mr. xxx Project:            2B + G + 14+ Lower Roof Hotels Building Plot No.:          xxx at Al Barsha 1st, Dubai Subject:         Issue regarding non availability of lights at site for working during evening Dear Tahir, With ref. to above, there are many confined areas where we are working till evening on every floor […]

Regarding MP Coordination layout

Date: xxx Ref. xxx Kind Attn:     Mr. xxx Project:            2B + G + 14+ Lower Roof Hotels Building Plot No.:          xxx at Al Barsha 1st, Dubai Subject:        Regarding MP Coordination layout Dear Tahir, With ref. to above, we need impact analysis, kindly provide us the following If we are implementing the change of wiring diagram for Room management system […]

In continuation for MEP coordination, from ref. xxx

Date: xxx Ref. xxx Kind Attn:     Mr. xxx Project:            2B + G + 14+ Lower Roof Hotels Building Plot No.:          xxx at Al Barsha 1st, Dubai Subject:           In continuation for MEP coordination, from ref. CC/MEP/03 Dear Tahir, In continuation for MEP coordination, from ref CC/MEP/03, kindly review the following. Propose the generator supplier and generator size from drawing […]

Minutes of meeting held with Mr. xxx (MEP-Coordinator)

Date: xxx Ref. xxx Kind Attn:     Mr. xxx Project:            2B + G + 14+ Lower Roof Hotels Building Plot No.:          xxx at Al Barsha 1st, Dubai Subject:          Minutes of meeting held with Mr. xxx (MEP-Coordinator) Dear MEP Team,             With reference to the above, we require the following: Status of drawings or Electrical Power layout of entire project. […]