Method Statement for Manhole Construction (Cast In Situ Stormwater Manholes)

CONTENTS Scope of Work Definitions References Subcontractors Materials Plant  & Equipment Safety Prior Activities Procedure Responsibilities Attachments 1. Scope: 1.1 This Method Statement covers the cast in situ concrete storm water manholes, single and double catch pit Type (I), (II), and (III).   2. Definitions: 2.1     MS: Storm Water Drainage Method Statement     2.2 ITR : Inspection and Testing […]

Method Statement for Future and Split Ducts

CONTENTS Purpose Scope of Work Definitions References Materials Plant  & Equipment Safety Prior Activities Procedure Responsibilities Attachments 1.0    Purpose To ensure that future, split duct and related activities are executed safely and in          accordance with the contract requirements and that all quality assurance / control               activities are conducted in a systematic manner, works are inspected and          […]

Method Statement for Installation of D.I pipes

CONTENTS Scope of Work Definitions References Subcontractors Materials Plant  & Equipment Safety Prior Activities Procedure Responsibilities Attachments 1. Scope: 1.1 This Method Statement covers the installation of  D.I pipes. 2. Definitions: 2.1     MS: D.I Method Statement: ductile iron method statement.     2.2 ITR  Inspection And test Request     2.3 PPS   Particular Project Specification     2.4 GPS   General […]

Method Statement for GRP Pipes Laying with Granular Surround

CONTENTS Scope of Work Definitions References Subcontractors Materials Plant  & Equipment Safety Prior Activities Procedure Responsibilities Attachments 1. Scope: 1.1 This Method Statement covers the laying of GRP Pipes with Granular surround. 2. Definitions: 2.1     MS: STM Method Statement : Storm Water Drainage Work     2.2 ITR  Inspection and Test Request     2.3 PPS   Particular Project Specification   […]

Method Statement for Storm Water and Drainage Earthwork

CONTENTS Scope of Work Definitions References Subcontractors Materials Plant  & Equipment Safety Prior Activities Procedure Responsibilities Attachments 1. Scope: 1.1 This Method Statement covers the following activities related to Storm Water and Drainage works       Site cleaning and grading   Trench excavation and backfill   Structural excavation and Backfill  2. Definitions: 2.1     MS: STM  Method Statement : Storm […]

Method Statement for Sub base and Gravel Base

CONTENTS Purpose Scope of Work Definitions References Materials Plant  & Equipment Safety Prior Activities Procedure Responsibilities Attachments 1.0    Purpose To ensure that sub base and gravel base, and related activities are executed safely and in accordance with the contract requirements and that all quality assurance / control activities are conducted in a systematic manner, works are inspected and conformance is […]

Method Statement for Surveying Work

CONTENTS Scope of Work Definitions References Subcontractors Materials Plant  & Equipment Safety Prior Activities Procedure Responsibilities Attachments 1. Scope: 1.1 This Method Statement covers the various steps in Site Survey Works.     2. Definitions: 2.1     MS: STM Method Statement : Surveying Work     2.2 ITR  Inspection and Test Request     2.3 PPS   Particular Project Specification     […]

Method Statement for Dewatering

CONTENTS Scope of Work Definitions References Subcontractors Materials Plant  & Equipment Safety Prior Activities Procedure Responsibilities Attachments 1. Scope: 1.1 This Method Statement covers the various methods utilized to control water in excavation.     2. Definitions: 2.1 MS: STM Method Statement : Storm Water Drainage Work     2.2 ITR    Inspection and Test Request     2.3 PPS   Particular […]

Method Statement for the Installation of Temporary and Interim Security Fence, Removal of Chain Link Fence

Table of Contents Purpose Scope of Work Definitions References Materials Plant  & Equipment Safety Prior Activities 9.0     Procedure 9.1 Installation of Temporary and Interim Security Fence 9.2 Removal of Chain Link Fence 10.0  Responsibilities 11.0  Attachments 11.1 Drawing PGAD 745/1008/G-311-A-R 0 1.0    Purpose To ensure that all Installation of Temporary and Interim Security Fence, removal of chain-link fence, and […]

METHOD STATEMENT UNDER GROUND FIRE FIGHTING WORK

Contents: Objective  Scope References Material Material Procurement, Handling and Storage Trenching & Bedding Backfilling Assembly & Laying BUTT WELD PROCESS Pressure Testing Outside The Trench Testing In The Trench Objective This method statement provides information concerning the method of construction to ensure compliance with contract requirements, drawing, technical specification and quality control to provide a successful installation, testing, and commissioning […]