JOB HAZARD ANALYSIS Backfilling of Building Structures

The responsible person is to ensure the control measures below are in place before the activity is carried out   TASK: Backfilling of Building Structures     Date:07 November 2006 No ACTIVITY HAZARD RISK CONTROL MEASURES TO MINIMISE / ELIMINATE RISK RESPONSIBLE PERSON 1 Backfilling & Compaction Equipment falling into work area Injuries to operatives in the work area Strict […]

ACTIVITY HAZARD ANALYSIS Backfilling of Building Structures

HAZARD / WORK: Backfilling of Building Structures LOCATION:______________________________________________ H=High                        M=Medium                   L=Low                                Significant Risks H M L   Who May Be Harmed 1 Work related upper limb disorders. Musculoskeletal injuries. Cuts, abrasions. Foot / toe injuries     X       2 Dehydration, heat exhaustion. Heat stroke     X   Employees…………………… X 3 Cuts, abrasions, broken bones, eye injuries […]

JOB HAZARD ANALYSIS TOOLBOX TALKS ATTACHMENTS of North Stormwater Retention Pond and Overtopping Spillway

Toolbox talks:-Manual HandlingCOSHHNOISE Manual Handling We lift, manoeuvre and handle goods every day of our lives in one way or another, not just whilst at work but also during social activities such as gardening, DIY, shopping and sport. A bad back or injury today, could, and regularly does, turn into a painful back problem for life! Lifting incorrectly could also […]

Method Statement for Construction of North Stormwater Retention Pond and Overtopping Spillway

CONTENTS Purpose Scope of Work Definitions References Materials Plant  & Equipment Safety Prior Activities Procedure Responsibilities Attachments Purpose 1.1       To ensure that the North Stormwater Retention Pond and Overtopping Spillway are executed safely and in accordance with the contract requirements and that all quality assurance/ control activities are conducted in a systematic manner, works are inspected and conformance is verified […]

JOB HAZARD ANALYSIS Construction of North Stormwater Retention Pond and Overtopping Spillway

  TASK: ­­­­­­­­ Construction of North Stormwater Retention Pond and Overtopping Spillway     Date: 06 November 2006 No ACTIVITY HAZARD RISK CONTROL MEASURES TO MINIMISE / ELIMINATE RISK RESPONSIBLE PERSON 1 Service location survey Manual handling operations (MHO’s) Work related upper limb disorders. Musculoskeletal injuries. Cuts, abrasions. Foot / toe injuries Maximum use of equipment to reduce need for […]

ACTIVITY HAZARD ANALYSIS Construction of North Stormwater Retention Pond and Overtopping Spillway

HAZARD / WORK:       Construction of North Stormwater Retention Pond and Overtopping Spillway LOCATION:                                                                                                  H=High                        M=Medium                   L=Low                                Significant Risks H M L   Who May Be Harmed 1 Work related upper limb disorders. Musculoskeletal injuries. Cuts, abrasions. Foot / toe injuries     X       2 Dehydration, heat exhaustion. Heat stroke     X   Employees…………………… X […]

JOB HAZARD ANALYSIS TOOLBOX TALKS ATTACHMENTS for Backfilling of Precast Units

Toolbox talks:-Manual HandlingCOSHHExcavationsNOISE Manual Handling We lift, manoeuvre and handle goods every day of our lives in one way or another, not just whilst at work but also during social activities such as gardening, DIY, shopping and sport. A bad back or injury today, could, and regularly does, turn into a painful back problem for life! Lifting incorrectly could also […]

Method Statement for Backfilling of Precast Units

CONTENTS Purpose Scope of Work Definitions References Materials Tools, Plant  & Equipment Safety Prior Activities Procedure Responsibilities Attachments Purpose 1.1       To ensure that the backfilling of precast units such as subgrade drainage inspection chambers, communication pits, and electrical pits is executed safely and in accordance with the contract requirements and that all quality assurance/ control activities are conducted in a […]

JOB HAZARD ANALYSIS Backfilling of Precast Units

The responsible person is to ensure the control measures below are in place before the activity is carried out   TASK: Backfilling of Precast Units     Date:7 November 2006 No ACTIVITY HAZARD RISK CONTROL MEASURES TO MINIMISE / ELIMINATE RISK RESPONSIBLE PERSON 1 Backfilling & Compaction Equipment falling into work area Injuries to operatives in the work area Strict […]

ACTIVITY HAZARD ANALYSIS Backfilling of Precast Units

HAZARD / WORK: Backfilling of Precast Units LOCATION:______________________________________________ H=High                        M=Medium                   L=Low                                Significant Risks H M L   Who May Be Harmed 1 Work related upper limb disorders. Musculoskeletal injuries. Cuts, abrasions. Foot / toe injuries     X       2 Dehydration, heat exhaustion. Heat stroke     X   Employees…………………… X 3 Cuts, abrasions, broken bones, eye injuries […]