ACTIVITY HAZARD ANALYSIS Backfilling of Box Culverts and Associated Structures

Method Statement for Casting of Blinding Concrete for Box Culvert and Installation of Precast Box Culvert Units

TABLE OF CONTENTS Purpose Scope of Work Definitions References Materials Plant  & Equipment Safety Prior Activities Procedure Responsibilities Attachments 1. Purpose 1.1 To ensure that the Blinding of Box Culverts and Installation of Precast Box Culvert units are executed safely and in accordance with the contract requirements and that all quality assurance/ control activities are […]

Method Statement for Casting of Blinding Concrete for Box Culvert and Installation of Precast Box Culvert Units Read Post »

Hazard Meaning and Definition

JOB HAZARD ANALYSIS Casting Blinding Concrete and Installation of Precast Box Culvert Units

  TASK: ­­­­­­­­ Casting Blinding concrete and Installation of Precast Box culverts     Date:5th Aug 2006 No ACTIVITY HAZARD RISK CONTROL MEASURES TO MINIMISE / ELIMINATE RISK RESPONSIBLE PERSON 1 Service location survey Manual handling operations (MHO’s) Work related upper limb disorders. Musculoskeletal injuries. Cuts, abrasions. Foot / toe injuries Maximum use of equipment

JOB HAZARD ANALYSIS Casting Blinding Concrete and Installation of Precast Box Culvert Units Read Post »

ACTIVITY HAZARD ANALYSIS Construction of Open Concrete Formed Channel

ACTIVITY HAZARD ANALYSIS Casting Blinding Concrete and Installation of Precast Box Culvert Units

HAZARD / WORK: Casting Blinding Concrete and Installation of Precast                                          Box Culvert Units LOCATION:______________________________________________ H=High                        M=Medium                   L=Low                                Significant Risks H M L   Who May Be Harmed 1 Work related upper limb disorders. Musculoskeletal injuries. Cuts, abrasions. Foot / toe injuries     X       2 Dehydration, heat exhaustion. Heat stroke  

ACTIVITY HAZARD ANALYSIS Casting Blinding Concrete and Installation of Precast Box Culvert Units Read Post »

Risk Assessment Procedure Step wise Guide

Airside Operational Area Safety Plan Construction of Taxiway Lima Intersection with Existing Runway

CONTENTS Purpose Scope of Work / Airside Operational Restrictions Definitions References Materials Plant and Equipment Safety and Security Responsibilities Annex A:  Air Traffic Control  (ATC) – Runway Curfew Procedures Attachments Purpose Aviation and Operational Safety during construction is the primary consideration in developing a work plan for the Pavement and Utility Infrastructure Construction at the

Airside Operational Area Safety Plan Construction of Taxiway Lima Intersection with Existing Runway Read Post »

ACTIVITY HAZARD ANALYSIS Construction of Open Concrete Formed Channel

Method Statement for Installation of Communication Sub-Ducts

CONTENTS Purpose Scope of Work Definitions References Materials Tools, Plant  & Equipment Safety Prior Activities Procedure Responsibilities Attachments Purpose 1.1       To ensure that the installation of communication sub-ducts and related activities are executed safely and in accordance with the contract requirements and that all quality assurance/ control activities are conducted in a systematic manner, works

Method Statement for Installation of Communication Sub-Ducts Read Post »

Risk Assessment Procedure Step wise Guide

ACTIVITY HAZARD ANALYSIS Installation of Communication Sub-Ducts

HAZARD / WORK:       Installation of Communication Sub-Ducts LOCATION: ______________________________________________ H=High                        M=Medium                   L=Low                                Significant Risks H M L   Who May Be Harmed 1 Work related upper limb disorders. Musculoskeletal injuries. Cuts, abrasions. Foot / toe injuries     X       2 Dehydration, heat exhaustion. Heat stroke     X   Employees…………………… X 3

ACTIVITY HAZARD ANALYSIS Installation of Communication Sub-Ducts Read Post »

JOB HAZARD ANALYSIS TOOLBOX TALKS ATTACHMENTS Casting Blinding Concrete for Foundation Building Structures

Toolbox talks for Rendering works

Toolbox talks:-Manual HandlingCOSHHNOISE Manual Handling We lift, manoeuvre and handle goods every day of our lives in one way or another, not just whilst at work but also during social activities such as gardening. A bad back or injury today, could, and regularly does, turn into a painful back problem for life! Lifting incorrectly could

Toolbox talks for Rendering works Read Post »

Plaster Work

Method Statement for Rendering Works for Buildings

CONTENTS Purpose Scope of Work Definitions References Materials Tools, Plant  & Equipment Safety Prior Activities Procedure Responsibilities Attachments Purpose 1.1       To ensure that the rendering works for all the buildings are executed safely and in accordance with the contract requirements and that all quality assurance/ control activities are conducted in a systematic manner, works are

Method Statement for Rendering Works for Buildings Read Post »