uPVC High Pressure Water Supply Piping System Installation Procedure

METHOD OF STATEMENT FOR MECHANICAL WORKS FOR SANITARY DRAINAGE

METHOD OF STATEMENT Scope: This method of statement applies to mechanical works for sanitary drainage of buildings. Purpose: The basis of construction /installation for effective and qualified results Significant materials needed: Abbreviations:           ASTM         American Society for Testing Materials           UPC             Uniform Plumbing Code           IAPINO       International Association of Plumbing and                                            Mechanical Officials

METHOD OF STATEMENT FOR MECHANICAL WORKS FOR SANITARY DRAINAGE Read Post »

METHOD STATEMENT WATER SUPPLY WORK

METHOD OF STATEMENT FOR WATER SUPPLY PIPE INSTALLATION INSIDE THE TOILET

METHOD OF STATEMENT FOR WATER SUPPLY PIPE INSTALLATION INSIDE THE TOILET a-1. Select and follow manufacturers recommendations for types of solvent cement for such conditions as temperature over 100ºF (38ºC), humidity over 60% or use of schedule 80 fittings. a-2. Proper handling of solvent cement should be strictly done to maintain effectiveness. a-3. Keep solvent

METHOD OF STATEMENT FOR WATER SUPPLY PIPE INSTALLATION INSIDE THE TOILET Read Post »

Scroll to Top