Ordinary Portland Cement (OPC) and its use.

Ordinary Portland Cement (OPC) is the most widely used type of cement in the world and is produced by inter-grinding a mixture of clinker and gypsum. The clinker is made by heating a mixture of limestone, clay, and other minerals to a high temperature in a kiln, while the gypsum is added to regulate the setting time of the cement. […]

Letter as notice of my resignation

November 10, xxx TO, HR department xxx Building Contracting LLC Dubai, UAE. Dear xxx, Please accept this letter as notice of my resignation from my position as Planning  Engineer. My last day of employment will be December xxx. It has been a pleasure working with the xxx team over the last three years. I would like to support the transition […]

HSE Plan (Health, Safety and Environment)

HSE Plan Health, Safety and Environment Revision Nr.: 1 Revision Date: xxx Document : HSE Plan Page 2 of 19 Table of Content 1. Introduction page 3 2. HSE Objectives page 4 3. EFG Scandinavia contractor management page 5 4. Overview of environmental management page 5 5. Environmental aspects page 7 6. Measures page 8 7. Risk Assessment page 9-10 […]

Undertaking Letter for Shoring works

Ref. No.: xxx/1021/DM/2022/02 Date: November 11, xxx To:       xxx Municipality Department of Building and Development Dubai, UAE Project: Proposed Warehouses On Plot No. xxx at Al xxx, Dubai, UAE, for Heirs of Mr. xxx Client: xxx Subject: Undertaking Letter for Shoring works Dear Sir, We, xxx Building Contracting LLC, Consultant of the above-mentioned project on Plot No. xxx at […]

Reply to letter dated 9th September xxx

REF: No. xxx/1023/EMSQUARE/2022/02 Date: 12th September 2022 To, Mr. xxx xxx ENGINEERING CONSULTANTS P.O. Box xxx, Dubai, UAE Project: Proposed Residential Private Villa (B+G+2+Roof) on Plot No. xxx at Dubai Water Canal, Dubai, UAE. Client:  xxx Estates LLC Subject: Reply to letter dated 9th September xxx Dear Sir, With reference to the above mentioned subject, as we are all well […]

SUBCONTRACT AGREEMENT FOR DEWATERING WORKS

SUBCONTRACT AGREEMENT FOR DEWATERING WORKS AGREEMENT NO        : XXX-P1016-SCA-DW-2021-02 AGREEMENT DATE  : 17th November XXX PROJECT                      : Proposed Development Of Residential Villa (B+G+1+R) On Plot No. XXX, at XXX, Dubai, U.A.E. CLIENT                            :  MR. XXX CONSULTANT             : M/s. XXX CONSULTANTS This Subcontract Agreement is made effective on the date 17th November XXX BETWEEN M/s. XXX BUILDING CONTRACTING L.L.C. (XXX), having […]

Appointment Letter for Dewatering works Subcontractor

REF: No. xxx/1016/SS-DOC/2021/01 Date: 08 December xxx xxx DEWATERING & LAND DRAINING CO. L.L.C. P.O. Box: xxx, Ras Al Khor, Dubai, UAE Project: Proposed Residential Villa (B+G+1+R) on Plat No. xxx, Palm Jumeirah– Dubai, UAE for Mr. xxx Subject: Appointment Letter for Dewatering works Subcontractor Dear Sir, With reference to the above subject, M/s xxx Building Contracting LLC, would like […]

Delay penalty due to failure to fulfil contractual obligations.

REF. No.: xxx/1016/SS-DOC/2022/2 Date: 31 October xxx xxx DEWATERING & LAND DRAINING CO. L.L.C. P.O. Box: 20782, Ras Al Khor, Dubai, UAE Project:Proposed Residential Villa (B+G+1+R) on Plat No. xxx, Palm Jumeirah– Dubai, UAE Client:Mr. xxx Subject: Delay penalty due to failure to fulfil contractual obligations. Dear Sir, We refer to the lump sum fixed daily rate subcontract agreement ref. […]