Method of Statement

Method Statement ffor HVAC Ductwork Insulation and Acoustic Lining

METHOD STATEMENT FOR INSULATION OF DUCTING SYSTEM

METHOD STATEMENT FOR INSULATION OF DUCTING SYSTEM TABLE OF CONTENTSSectionDescriptionPage No1.0PURPOSE AND SCOPE42.0OBJECTIVES43.0REFERENCE DOCUMENTS44.0CONSTRUCTION METHODOLOGY4-115.0RESPONSIBILITIES11-126.0LIST OF MAIN EQUIPMENT, TOOLS, AND INSTRUMENTS127.0MATERIAL HANDLING12-138.0HEALTH, SAFETY, & WELFARE139.0ENVIRONMENT1410.0COMMUNICATION & TRAINING1411.0FIELD QUALITY CONTROL14Method Statement for HVAC DUCTWORK & ACCESSORIESPage 3 of 11

METHOD STATEMENT FOR INSULATION OF DUCTING SYSTEM Read Post »

Method Statement for Installation, Insulation Testing of Condensate Drain Pipework

METHOD STATEMENT FOR INSULATION OF CHILLED WATER PIPING

METHOD STATEMENT FOR INSULATION OF CHILLED WATER PIPING TABLE OF CONTENTSSectionDescriptionPage No1.0Purpose and Scope42.0Objectives43.0References44.0General55.0Pre- works5-66.0Works6-407.0Responsibility40-418.0Engineering419.0Materials41-4210.0Plant and Equipment4211.0Health, Safety & Welfare4212.0Environment4313.0Communication and Training4314.0Quality Control43Method Statement for Insulation of Chilled water PipingPage 3 of 8

METHOD STATEMENT FOR INSULATION OF CHILLED WATER PIPING Read Post »

Method Statement ffor HVAC Ductwork Insulation and Acoustic Lining

METHOD STATEMENT FOR INSTALLATION OF HVAC DUCTWORK

TABLE OF CONTENTSSectionDescriptionPage No1.0PURPOSE AND SCOPE42.0OBJECTIVES43.0REFERENCES44.0GENERAL4-65.0PRE-WORKS6-96.0WORKS9-127.0DUCT AIR LEAKAGE TEST PROCEDURE13-198.0RESPONSIBILITIES209.0ENGINEERING2010.0MATERIALS2111.0PLANT AND EQUIPMENT21-2212.0HEALTH, SAFETY & WELFARE2213.0ENVIRONMENT2214.0COMMUNICATION AND TRAINING2315.0QUALITY CONTROL23Method Statement for HVAC DUCTWORK & ACCESSORIESPage 3 of 20

METHOD STATEMENT FOR INSTALLATION OF HVAC DUCTWORK Read Post »

AIR DISTRIBUTION SYSTEM CHECK LIST

METHOD STATEMENT FOR INSTALLATION OF HVAC DUCTWORK

METHOD STATEMENT FOR INSTALLATION OF HVAC DUCTWORK TABLE OF CONTENTSSectionDescriptionPage No1.0PURPOSE AND SCOPE42.0OBJECTIVES43.0REFERENCES44.0GENERAL4-65.0PRE-WORKS6-96.0WORKS9-127.0DUCT AIR LEAKAGE TEST PROCEDURE13-198.0RESPONSIBILITIES209.0ENGINEERING2010.0MATERIALS2111.0PLANT AND EQUIPMENT21-2212.0HEALTH, SAFETY & WELFARE2213.0ENVIRONMENT2214.0COMMUNICATION AND TRAINING2315.0QUALITY CONTROL23Method Statement for HVAC DUCTWORK & ACCESSORIESPage 3 of 20

METHOD STATEMENT FOR INSTALLATION OF HVAC DUCTWORK Read Post »

Chiller

METHOD STATEMENT FOR INSTALLATION OF CHILLED WATER PIPING SYSTEM

METHOD STATEMENT FOR INSTALLATION OF CHILLED WATER PIPING SYSTEM TABLE OF CONTENTSSectionDescriptionPage No1.0Purpose and Scope42.0Objectives43.0References54.0General55.0Pre- works5-66.0Works6-177.0Responsibility178.0Engineering179.0Materials18-1911.0Plant and Equipment19-2012.0Health, Safety & Welfare2013.0Environment2114.0Communication and Training2115.0Quality Control21Method Statement for the Installation ofChilled water Piping SystemPage 3 of 17

METHOD STATEMENT FOR INSTALLATION OF CHILLED WATER PIPING SYSTEM Read Post »

AIR DISTRIBUTION SYSTEM CHECK LIST

Method Statement for HVAC Piping Installation Work

Method Statement for HVAC Piping Installation Work Contents This procedure defines the method used to ensure that the HVAC piping system Installation comprising all pipes, tubes, valves, fittings, reducers, expanders, nipples, Vents, anchors, brackets, sleeves and all accessories, components connected thereto as An integrated part of the HVAC piping system to be correct and acceptable

Method Statement for HVAC Piping Installation Work Read Post »

uPVC High Pressure Water Supply Piping System Installation Procedure

METHOD STATEMENT FOR Drainage Piping System

METHOD STATEMENT FOR Drainage Piping System CONTENTS CONTENTS…………………………………………………………………………………………………………. 1.0       Scope……………………………………………………………………………………………………. 3 2.0     REFERENCES……………………………………………………………………………………………………………………………………………………………..3 3.0       Responsibilities………………………………………………………………………………… 3 4.0       SEQUENCING………………………………………………………………………………………….. 4 5.0       CONSTRUCTION PROCEDURES……………………………………………………………… 4 6.0       TESTING………………………………………………………………………………………………… 5 7.0      EQUPMENT.……………………………………………………………………………………………………………………………………..5 8.0       Materials……………………………………………………………………………………………. 5 9.0       Environmental Considerations…………………………………………………… 6 10.0    Attachments……………………………………………………………………………………… 6 Attachment 1: Key to Safety Symbols…………………………………………………………………………….. 7 This method statment describe the specfic safe working method which

METHOD STATEMENT FOR Drainage Piping System Read Post »

3-tips-for-Fire-Pump

METHOD STATEMENT FOR INSTALLATION AND INSPECTION OF FIRE FIGHTING SYSTEM

METHOD STATEMENT FOR INSTALLATION AND INSPECTION OF FIRE FIGHTING SYSTEM TABLE OF CONTENTS 1.     REVISION RECORD.. 3 2.     SCOPE.. 4 3.     PURPOSE.. 4 4.     REFERENCES.. 4 4.1.       Contract documents. 4 4.2.       Contractors Submittal Error! Bookmark not defined. 5.     DEFINITIONS / ABBREVIATIONS.. 4 5.1.       Definition. 4 5.2.       Abbreviations. 5 6.     QUALITY CONTROL. 5 7.     EQUIPMENTS/ TOOLS

METHOD STATEMENT FOR INSTALLATION AND INSPECTION OF FIRE FIGHTING SYSTEM Read Post »

METHOD STATEMENT WATER SUPPLY WORK

METHOD STATEMENT FOR (PPR) Water Supply System

METHOD STATEMENT FOR (PPR) Water Supply System CONTENTS CONTENTS…………………………………………………………………………………………………………. 1.0       Scope……………………………………………………………………………………………………. 3 2.0      REFERENCES…………………………………………………………………………………………………………………………………………………………..3. 3.0       Responsibilities………………………………………………………………………………… 3 4.0       SEQUENCING………………………………………………………………………………………….. 3 5.0       CONSTRUCTION PROCEDURES……………………………………………………………… 4 6.0       TESTING………………………………………………………………………………………………… 5 7.0      EQUPMENT.………………………………………………………………………………………………………………………………………5 8.0       Materials……………………………………………………………………………………………. 5 9.0       Environmental Considerations…………………………………………………… 6 10.0    Attachments……………………………………………………………………………………… 6 Attachment 1: Key to Safety Symbols…………………………………………………………………………….. 7 This method statement describe the specific safe working method

METHOD STATEMENT FOR (PPR) Water Supply System Read Post »

CHECKLIST FOR INSTALLATION OF WATER BOOSTER PUMPS

Method Statement Title: Testing & Commissioning of Domestic Water Pumps

Method Statement Title: Testing & Commissioning of Domestic Water Pumps Scope The scope of this Method Statement is to define the method of Testing and Commissioning of Domestic Water Pumps installed within the Burj Dubai – The Residences, in accordance with the manufacturer’s instructions attached.             Note a.         For installation of Domestic Water Pumps refer

Method Statement Title: Testing & Commissioning of Domestic Water Pumps Read Post »