Method of Statement

AUDIO VISUAL SYSTEM

METHOD STATEMENT FOR Audio  Visual  System  INSTALLATION

METHOD STATEMENT FOR Audio  Visual  System  INSTALLATION TABLE OF CONTENTS 1. SCOPE 2. definitions 3. HEALTH  AND  SAFETY 4. OPERATION 5. installation  and  fixation 6. RESPONSIBILITIES 7. MANPOWER  REQUIRED 8. MATERIALS  REQUIREMENTS 9. EQUIPMENTs  REQUIREMENTs 10. WASTE  MANAGEMENT 11. SPECIAL  CONTROL  MEASURES 12. SUPPORTING  DOCUMENTATION 13. DISTRIBUTION 1. SCOPE This procedure to clear the method […]

METHOD STATEMENT FOR Audio  Visual  System  INSTALLATION Read Post »

ACCESS-CONTROL-SYSTEMS

METHOD STATEMENT FOR ACCESS CONTROL SYSTEM INSTALLATION

METHOD STATEMENT FOR ACCESS CONTROL SYSTEM INSTALLATION TABLE OF CONTENTS 1. SCOPE 2. definitions 3. HEALTH  AND  SAFETY 4. OPERATION 5. installation and fixation 6. RESPONSIBILITIES 7. MANPOWER  REQUIRED 8. MATERIALS  REQUIREMENTs 9. EQUIPMENTs  REQUIREMENTs 10. WASTE MANAGEMENT 11. SPECIAL CONTROL MEASURES 12. SUPPORTING  DOCUMENTATION 13. DISTRIBUTION 1. SCOPE This procedure to clear the method

METHOD STATEMENT FOR ACCESS CONTROL SYSTEM INSTALLATION Read Post »

Building Footing

METHOD STATEMENT FOR SHIFTING OF FOOTINGS

Project Name    : Proposed Development of Residential Villa (G+2) On Plot No. xxx Location             : Palm Jumeirah, Dubai, United Arab Emirates Client                   : Mr. xxx Consultant         : Al xxx Consultants Contractor         : M/S xxx Building Contracting LLC METHOD STATEMENT FOR SHIFTING OF FOOTINGS            Table of Contents                1. Purpose                2. Tools Plant and

METHOD STATEMENT FOR SHIFTING OF FOOTINGS Read Post »

False Ceiling

Method of Statement of False Ceiling/Suspended ceiling works

Introduction Scope & Objective. Equipment’s & Tools/ Manpower/ Materials. How work is being Started. Setting Out. Ceiling suspension. Inspection/ Clearance. Joint Compound, Joint Taping Work. AC Grill, Light Cutting & Access Panel Fixing. Contact Us. Introduction –What is a false ceiling?A false ceiling or alternatively called drop ceiling is a fixed framework made of either

Method of Statement of False Ceiling/Suspended ceiling works Read Post »

GRP Lining Works

Method of Statement of GRP Lining Works

Method of WorkingAl Marwa Fiber Glass Factory required these steps for Surface Preparation, before start thework. These steps must be done by Contractor/Owner.GRINDING:After concreting many irregularities on the surface remain and if lamination iscarried out on such surface finishing on the outer surface will be inferior. Hence, surfacegrinding of concrete has to be done, if

Method of Statement of GRP Lining Works Read Post »

Scroll to Top