Method of Statement

ACTIVITY HAZARD ANALYSIS Application of ISOLA N-S Grout

Method Statement for Application of ISOLA N-S Grout Material

CONTENTS Purpose Scope of Work Definitions References Materials Tools, Plant  & Equipment Safety Prior Activities Procedure Responsibilities Attachments Purpose 1.1       To ensure that the application of ISOLA N-S Grout Material is executed safely and in accordance with the contract requirements and that all quality assurance/ control activities are conducted in a systematic manner, works are […]

Method Statement for Application of ISOLA N-S Grout Material Read Post »

Bituminous-Membrane-Waterproofing

Method Statement for Placing of Surface Protection Material

CONTENTS Purpose Scope of Work Definitions References Materials Tools, Plant  & Equipment Safety Prior Activities Procedure Responsibilities Attachments 1.0       Purpose To ensure that placing of surface protection material and related activities are executed safely and in accordance with the contract requirements and that all quality assurance/control activities are conducted in a systematic manner, works are

Method Statement for Placing of Surface Protection Material Read Post »

Bituminous-Membrane-Waterproofing

Method Statement for Placing of Surface Protection Material

CONTENTS 1.0 Purpose 2.0 Scope of Work 3.0 Definitions 4.0 References 5.0 Materials 6.0 Tools, Plant & Equipment 7.0 Safety 8.0 Prior Activities 9.0 Procedure 10.0 Responsibilities 11.0 Attachments 1.0 Purpose 1.1 To ensure that placing of surface protection material and related activities are executed safely and in accordance with the contract requirements and that

Method Statement for Placing of Surface Protection Material Read Post »

ACTIVITY HAZARD ANALYSIS Construction of Cast-in-Situ Concrete for Building structure

Method Statement for Backfilling of Building Structures

TABLE OF CONTENTS Purpose Scope of Work Definitions References Materials Tools, Plant  & Equipment Safety Prior Activities Procedure Responsibilities Attachments Purpose 1.1       To ensure that the backfilling of building structures is executed safely and in accordance with the contract requirements and that all quality assurance/ control activities are conducted in a systematic manner, works are

Method Statement for Backfilling of Building Structures Read Post »

ACTIVITY HAZARD ANALYSIS Construction of North Stormwater Retention Pond and Overtopping Spillway

Method Statement for Construction of North Stormwater Retention Pond and Overtopping Spillway

CONTENTS Purpose Scope of Work Definitions References Materials Plant  & Equipment Safety Prior Activities Procedure Responsibilities Attachments Purpose 1.1       To ensure that the North Stormwater Retention Pond and Overtopping Spillway are executed safely and in accordance with the contract requirements and that all quality assurance/ control activities are conducted in a systematic manner, works are

Method Statement for Construction of North Stormwater Retention Pond and Overtopping Spillway Read Post »

ACTIVITY HAZARD ANALYSIS Construction of Open Concrete Formed Channel

Method Statement for Backfilling of Precast Units

CONTENTS Purpose Scope of Work Definitions References Materials Tools, Plant  & Equipment Safety Prior Activities Procedure Responsibilities Attachments Purpose 1.1       To ensure that the backfilling of precast units such as subgrade drainage inspection chambers, communication pits, and electrical pits is executed safely and in accordance with the contract requirements and that all quality assurance/ control

Method Statement for Backfilling of Precast Units Read Post »

ACTIVITY HAZARD ANALYSIS Construction of Cast-in-Situ Concrete for Building structure

Method Statement for Construction of Cast-in-Situ Concrete for Building Structures

CONTENTS Purpose Scope of Work Definitions References Materials Tools, Plant  & Equipment Safety Prior Activities Procedure Responsibilities Attachments Purpose To ensure that the Cast-In-Situ Concrete Building Structures are executed safely and in accordance with the contract requirements and that all quality assurance/control activities are conducted in a systematic manner, works are inspected and conformance is

Method Statement for Construction of Cast-in-Situ Concrete for Building Structures Read Post »

ACTIVITY HAZARD ANALYSIS Casting Blinding Concrete for Foundation Building Structures

Method Statement for Casting of Blinding Concrete for Building Structures

TABLE OF CONTENTS Purpose Scope of Work Definitions References Materials Tools, Plant  & Equipment Safety Prior Activities Procedure Responsibilities Attachments 1. Purpose 1.1 To ensure that the blinding for foundation are executed safely and in accordance with the contract requirements and that all quality assurance/ control activities are conducted in a systematic manner, works are

Method Statement for Casting of Blinding Concrete for Building Structures Read Post »

Building Footing

Method Statement for Excavation and Foundation Preparation for Building Structures

Table of Contents Purpose Scope of Work Definitions References Materials Plant  & Equipment Safety Prior Activities Procedure Responsibilities Attachments   1.0       Purpose To ensure that all excavation and foundation preparation of building activities are executed safely and in accordance with the contract requirements and that all quality assurance / control activities are conducted in a

Method Statement for Excavation and Foundation Preparation for Building Structures Read Post »

ACTIVITY HAZARD ANALYSIS Backfilling of Box Culverts and Associated Structures

Method Statement for Backfilling of Box Culverts and Associated Structures

CONTENTS Purpose Scope of Work Definitions References Materials Plant  & Equipment Safety Prior Activities Procedure Responsibilities Attachments Purpose 1.1       To ensure that the backfilling of box culverts and associated structures (catch pits, access chambers, culvert outflow structures, transition manholes, etc.) is executed safely and in accordance with the contract requirements and that all quality assurance/

Method Statement for Backfilling of Box Culverts and Associated Structures Read Post »

Scroll to Top