Dry wall partition Method statement
Dry wall partition Method statement Read Post »
FABRICATION AND INSTALLATION OF WOODEN DOORS 1.0 OBJECTIVE 1.1 Is to define the requirements for fabrication, supply and installation of wooden doors including fire rated for the buildings under the contract no GTC.101/ED/01 Engineering, Procurement, Installation and Commissioning (EPIC) of Ras Laffan Utilization Project –Buildings and utilities and support service Phase 1-Utilities. 2.0 SCOPE 2.1
Doors Method statement Read Post »
CONCRETING WORKS 1.0 OBJECTIVE 1.1 Is to define the requirements for the design, supply and execution g concrete works for the constructions under the contract no GTC.101/ED/01 Engineering, Procurement, Installation and Commissioning (EPIC) of Ras Laffan Utilization Project –Buildings and utilities and support service Phase 1-Utilities. 2.0 SCOPE 2.1 For foundation, substructure and superstructure of
Concreting Method statement Read Post »
BLOCKWORK CAVITY WALL 1.0 OBJECTIVE 1.1 Is to define the method of construction and quality requirements of blockwork cavity walls for the contract no GTC.101/ED/01 Engineering, Procurement, Installation and Commissioning (EPIC) of Ras Laffan Utilization Project –Buildings and utilities and support service Phase 1-Utilities. 2.0 SCOPE 2.1 Blockwork Cavity wall for the buildings in Service
Cavity wall Method statement Read Post »
CARPET FLOORING WORKS 1.0 OBJECTIVE 1.1 To define the requirements and procedure for carpet flooring works under the contract no GTC.101/ED/01 Engineering, Procurement, Installation and Commissioning (EPIC) of Ras Laffan Utilization Project –Buildings and utilities and support service Phase 1-Utilities. 2.0 SCOPE 2.1 Applicable to all the office buildings at Service Base Area, Service Berth
Carpet flooring Method statement Read Post »
CONCRETE BLOCK WORK 1.0 OBJECTIVE 1.1 Is to define the requirements for supply and laying of concrete block work for the buildings and utilities under the contract no GTC.101/ED/01 Engineering, Procurement, Installation and Commissioning (EPIC) of Ras Laffan Utilization Project –Buildings and utilities and support service Phase 1-Utilities. 2.0 SCOPE 2.1 Concrete block work for
Block work-Method statement Read Post »
TABLE OF CONTENTS Purpose Scope of Work Definitions References Materials Plant & Equipment Safety Prior Activities Procedure Responsibilities Attachments 1. Purpose 1.1 To ensure that the Blinding of Box Culverts and Installation of Precast Box Culvert units are executed safely and in accordance with the contract requirements and that all quality assurance/ control activities are
CONTENTS Purpose Scope of Work Definitions References Materials Tools, Plant & Equipment Safety Prior Activities Procedure Responsibilities Attachments Purpose 1.1 To ensure that the installation of communication sub-ducts and related activities are executed safely and in accordance with the contract requirements and that all quality assurance/ control activities are conducted in a systematic manner, works
Method Statement for Installation of Communication Sub-Ducts Read Post »
CONTENTS Purpose Scope of Work Definitions References Materials Tools, Plant & Equipment Safety Prior Activities Procedure Responsibilities Attachments Purpose 1.1 To ensure that the rendering works for all the buildings are executed safely and in accordance with the contract requirements and that all quality assurance/ control activities are conducted in a systematic manner, works are
Method Statement for Rendering Works for Buildings Read Post »
Table of Contents Purpose Scope of Work Definitions References Materials Plant & Equipment Safety Prior Activities Procedure Responsibilities Attachments 1.0 Purpose To ensure that all block works activities are executed safely and in accordance with the contract requirements and that all quality assurance / control activities are conducted in a systematic manner, works are
Method Statement for Block Works for Building Read Post »