Method of Statement

Bituminous-Membrane-Waterproofing

Roof waterproofing Method statement

ROOF WATER-PROOFING 1.0 OBJECTIVE 1.1 Is to define the requirements for laying of roof water proofing membrane for the contract no GTC.101/ED/01 Engineering, Procurement, Installation and Commissioning (EPIC) of Ras Laffan Utilization Project –Buildings and utilities and support service Phase 1-Utilities. 2.0 SCOPE 2.1 Water and thermal proofing of roof of buildings in Service Base […]

Roof waterproofing Method statement Read Post »

Rebar on construction site

Reinforcement Method statement

STEEL REINFORCEMENTS FOR CONCRETE WORKS 1.0 OBJECTIVE 1.1 Is to define the requirements for the supply and execution g Reinforcement   works for the constructions under the contract no GTC.101/ED/01 Engineering, Procurement, Installation and Commissioning (EPIC) of Ras Laffan Utilization Project –Buildings and utilities and support service Phase 1-Utilities. 2.0 SCOPE 2.1 For foundation, substructure and

Reinforcement Method statement Read Post »

method-statement-for-water-proofing-membrane-for-swimming-pool

Protection to substructure Method statement

PROTECTION WORK TO SUBSTRUCTURE 1.0 OBJECTIVE 1.1 Is to define the requirements for the supply and fixing of substructure protection works for the building foundations under the contract no GTC.101/ED/01 Engineering, Procurement, Installation and Commissioning (EPIC) of Ras Laffan Utilization Project –Buildings and utilities and support service Phase 1-Utilities. 2.0 SCOPE 2.1 For the building

Protection to substructure Method statement Read Post »

Plaster Work

Plastering Method statement

PLASTERING WORK 1.0 OBJECTIVE 1.1  To define the requirements and procedure for plastering works for the contract no GTC.101/ED/01 Engineering, Procurement, Installation and Commissioning (EPIC) of Ras Laffan Utilization Project –Buildings and utilities and support service Phase 1-Utilities. 2.0 SCOPE 2.1 Applicable to all the buildings and utilities at Service Base Area, Service Berth Area,

Plastering Method statement Read Post »

Painting Method statement

BUILDING PAINTING WORKS OBJECTIVE  1.1 Is to define the procedural requirements for supply and application of decorative paints for the buildings under the contract no GTC.101/ED/01 Engineering, Procurement, Installation and Commissioning (EPIC) of Ras Laffan Utilization Project –Buildings and utilities and support service Phase 1-Utilities. 2.0 SCOPE : 2.1 Application of  decorative coatings to the

Painting Method statement Read Post »

Door handle

Iron mongeries Method statement

IRON MONGERY 1.0 OBJECTIVE 1.1 Is to define the procedure and quality requirements for procurement and  installation of Iron Mongery for the contract no GTC.101/ED/01 Engineering, Procurement, Installation and Commissioning (EPIC) of Ras Laffan Utilization Project –Buildings and utilities and support service Phase 1-Utilities. 2.0 SCOPE 2.1 Procurement, supply and installation of iron mongery for

Iron mongeries Method statement Read Post »

Tile Installation

Floor tiling Method statement

FLOOR TILING WORKS 1.0 OBJECTIVE 1.1  To define the requirements and describe the procedure for floor tiling works for the contract no GTC.101/ED/01 Engineering, Procurement, Installation and Commissioning (EPIC) of Ras Laffan Utilization Project –Buildings and utilities and support service Phase 1-Utilities. 2.0 SCOPE 2.1 Applicable to all toilet areas and pantry in buildings, work

Floor tiling Method statement Read Post »

Method Statement for Sub base and Gravel Base

Earthwork excavation Method statement

EARTHWORK EXCAVATION, BACKFILLING AND COMPACTION 1.0 OBJECTIVE 1.1  To define the requirement and describe the procedure for earthwork excavation, backfilling and compaction works for the contract no GTC.101/ED/01 Engineering, Procurement, Installation and Commissioning (EPIC) of Ras Laffan Utilization Project –Buildings and utilities and support service Phase 1-Utilities. 2.0 SCOPE 2.1 Applicable to all the buildings

Earthwork excavation Method statement Read Post »