Method of Statement

sanitary-ware

METHOD STATEMENT FOR INSTALLATION & TESTING OF PLUMBING FIXTURES, SANITARY WARES & ACCESSORIES

CONTENTS 1.0 PURPOSE 2.0 SCOPE 3.0 REFERENCES 4.0 DEFINITIONS 5.0 RESPONSIBILITIES 6.0 EQUIPMENTS 7.0 PROCEDURE 8.0 ATTACHMENTS       1.0 PURPOSE This method statement is applicable for Supply & Installation of Plumbing Fixtures, Sanitary Wares & Accessories for the project as mentioned in the Approved Shop Drawings for Drainage System. 2.0 SCOPE Supply & […]

METHOD STATEMENT FOR INSTALLATION & TESTING OF PLUMBING FIXTURES, SANITARY WARES & ACCESSORIES Read Post »

Wet Chemical Fire Suppression System for Kitchen Hoods

METHOD STATEMENT FOR INSTALLATION, TESTING & COMMISSIONING OF CLEAN AGENT SYSTEM

CONTENTS 1.0 PURPOSE 2.0 SCOPE 3.0  REFERENCES 4.0  DEFINITIONS 5.0  RESPONSIBILITIES 6.0  EQUIPMENT 7.0  PROCEDURE 8.0 ATTACHMENTS 1.0 PURPOSE The purpose of this method statement is to outline the method for handling, storage, installation, testing and commissioning for the Clean Agent System in accordance with the requirements specified in the relevant NFPA Codes, Standards and

METHOD STATEMENT FOR INSTALLATION, TESTING & COMMISSIONING OF CLEAN AGENT SYSTEM Read Post »

3-tips-for-Fire-Pump

METHOD STATEMENT FOR INSTALLATION & TESTING FOR FIRE FIGHTING PIPING SYSTEM AND ACCESSORIES

CONTENTS 1.0   PURPOSE 2.0  SCOPE 3.0  REFERENCES 4.0  DEFINITIONS 5.0  RESPONSIBILITIES 6.0  EQUIPMENT 7.0  PROCEDURE 8.0 ATTACHMENTS   1.0 PURPOSE This method statement is applicable for Installation & testing of Fire Fighting Piping system and its accessories in all areas for the project. 2.0 SCOPE Supply , installation & testing of Fire Fighting Piping system

METHOD STATEMENT FOR INSTALLATION & TESTING FOR FIRE FIGHTING PIPING SYSTEM AND ACCESSORIES Read Post »

CHECK LIST FOR INSTALLATION OF EXTERNAL FIRE HYDRANT

METHOD STATEMENT FOR INSTALLATION,TESTING & COMMISSIONING OF EXTERNAL FIRE HYDRANT

CONTENTS 1.0 PURPOSE 2.0 SCOPE 3.0 REFERENCES 4.0 DEFINITIONS 5.0 RESPONSIBILITIES 6.0 EQUIPMENTS 7.0 PROCEDURE 8.0 ATTACHMENTS     1.0 PURPOSE This method statement is applicable for the Installation, Testing & Commissioning of External Fire Hydrant for the project as mentioned in the Specifications & Approved Shop Drawings. 2.0 SCOPE This method Statement shall cover

METHOD STATEMENT FOR INSTALLATION,TESTING & COMMISSIONING OF EXTERNAL FIRE HYDRANT Read Post »

Checklist For Above Ground Water Piping Installation

METHOD STATEMENT FOR INSTALLATION AND TESTING OF DOMESTIC COLD / HOT WATER SUPPLY PIPING AND ACCESSORIES

CONTENTS 1.0 PURPOSE 2.0 SCOPE 3.0  REFERENCES 4.0  DEFINITIONS 5.0  RESPONSIBILITIES 6.0  EQUIPMENT 7.0  PROCEDURE 8.0 ATTACHMENTS 1.0 PURPOSE This method statement is applicable for Installation & testing of Domestic Cold and Hot water supply Piping system and its accessories ( Above & Below Ground) in all areas for the project. 2.0 SCOPE Supply ,

METHOD STATEMENT FOR INSTALLATION AND TESTING OF DOMESTIC COLD / HOT WATER SUPPLY PIPING AND ACCESSORIES Read Post »

False ceiling work

Suspended Ceiling Method statement

SUSPENDED CEILING WORK 1.0 OBJECTIVE To describe the procedure for installing suspended ceiling for the buildings under the contract no GTC.101/ED/01 Engineering, Procurement, Installation and Commissioning (EPIC) of Ras Laffan Utilization Project –Buildings and utilities and support service Phase 1-Utilities. 2.0 SCOPE To install suspended ceilings in the buildings at Service Berth, Service Base and

Suspended Ceiling Method statement Read Post »

ACTIVITY HAZARD ANALYSIS Casting Blinding Concrete for Foundation Building Structures

Screed Method statement

FLOOR SCREED WORKS 1.0 OBJECTIVE 1.1  To describe the procedure, for laying of floor screed for the contract no GTC.101/ED/01 Engineering, Procurement, Installation and Commissioning (EPIC) of Ras Laffan Utilization Project –Buildings and utilities and support service Phase 1-Utilities. 2.0 SCOPE 2.1 Applicable to all the buildings in at Service Base Area, Service Berth Area,

Screed Method statement Read Post »

Scroll to Top