Method of Statement

METHOD STATEMENT WATER SUPPLY WORK

METHOD OF STATEMENT FOR WATER SUPPLY PIPE INSTALLATION INSIDE THE TOILET

METHOD OF STATEMENT FOR WATER SUPPLY PIPE INSTALLATION INSIDE THE TOILET a-1. Select and follow manufacturers recommendations for types of solvent cement for such conditions as temperature over 100ºF (38ºC), humidity over 60% or use of schedule 80 fittings. a-2. Proper handling of solvent cement should be strictly done to maintain effectiveness. a-3. Keep solvent […]

METHOD OF STATEMENT FOR WATER SUPPLY PIPE INSTALLATION INSIDE THE TOILET Read Post »

METHOD STATEMENT MEGGER TESTING FOR POWER CABLES & BRANCH CIRCUIT WIRING

METHOD STATEMENT MEGGER TESTING FOR POWER CABLES & BRANCH CIRCUIT WIRING

EQUIPMENT AND TOOLS:- 1.       Megger Instrument shall be having valid calibration. 2.       Megger-with range 500V/1000V shall be used for conducting the test.           Megger range 500 V shall be used for Wire testing           Megger range 1000 V shall be used for Cable testing PRE – TEST PREPARATION:- 1.    The leads used for connecting megger

METHOD STATEMENT MEGGER TESTING FOR POWER CABLES & BRANCH CIRCUIT WIRING Read Post »

METHOD STATEMENT FOR WIRES AND CABLES INSTALLATION

METHOD STATEMENT CABLE TRAYS

TABLE OF CONTENTS     1.0    Revision Status   Revision No Date Prepared By Reviewed By Arabtech Approved   Revision Description     0 5/10/04     S.Georgiou   C.Ctorides   G.Georghiou M.Pickup       1 6/07/04     S.Georgiou   C.Ctorides   G.Georghiou M.Pickup       2 26/09/04     S.Georgiou  

METHOD STATEMENT CABLE TRAYS Read Post »

METHOD STATEMENT FOR LV SWITCHGEAR AND MOTOR CONTROL CENTER INSTALLATION

METHOD STATEMENT MAIN DISTRIBUTION BOARDS, SUB-MAIN DISTRIBUTION BOARDS & DISTRIBUTION BOARDS TESTING

TABLE OF CONTENTS a. Safety Rules during testingb. Safety lightingc. Task lightingd. Emergency arrangements• General• Fire Precautions• Communicatione. Risks Control• Hazards/Risks• 3rd Party Protection• Environmental Considerations a. Generalb. Personnel Protective Equipmentc. Power 1.0 Revision StatusRevisionNo Date PreparedBy ReviewedBy Arabtech ApprovedRevisionDescription 019 April 05D.SAVVA S.GEORGIOUK.MARNERIDESM.PICKUPFirst submission 1.0 SCOPE / OBJECTIVE This method statement covers the testing

METHOD STATEMENT MAIN DISTRIBUTION BOARDS, SUB-MAIN DISTRIBUTION BOARDS & DISTRIBUTION BOARDS TESTING Read Post »

METHOD STATEMENT FOR WIRES AND CABLES INSTALLATION

METHOD STATEMENT LV CABLES TESTING

TABLE OF CONTENTS a. Safety Rules during testingb. Safety lightingc. Task lightingd. Emergency arrangements• General• Fire Precautions• Communicatione. Risks Control• Hazards/Risks• 3rd Party Protection• Environmental Considerations a. Generalb. Personnel Protective Equipmentc. Power 1.0 Revision StatusRevisionNo Date PreparedBy ReviewedBy Arabtech ApprovedRevisionDescription 010 April 05D.SAVVA S.GEORGIOU K.MARNERIDESM.PICKUPFirst submission 1.0 SCOPE / OBJECTIVE This method statement covers the

METHOD STATEMENT LV CABLES TESTING Read Post »

Scroll to Top