The responsible person is to ensure the control measures below are in place before the activity is carried out
TASK: Backfilling of Building Structures | Date:07 November 2006 | |||||
No | ACTIVITY | HAZARD | RISK | CONTROL MEASURES TO MINIMISE / ELIMINATE RISK | RESPONSIBLE PERSON | |
1 | Backfilling & Compaction | Equipment falling into work area | Injuries to operatives in the work area | Strict access control to the work area, use of stop blocks as appropriate No vehicles allowed closer than 2 metres from the work area. | ||
Vehicles falling into excavation | Plant related injuries. | Stop blocks will be erected 2 metres from the excavation edge. No vehicles will be allowed closer than 2 metres from the work area. | ||||
Vehicle / plant overturning | Entrapment, Crush injuries | Out riggers to be in place before works takes place | ||||
Noise | Deafness, CEMP violation | Noise monitoring will be conducted to measure noise as required by the CEMP. Proactive measures will be taken to reduce noise SFAIRP. Hearing protection will be available on request to all exposed staff should the TWA Noise level reach 80dB. Hearing protection will be mandatory if the TWA background noise reaches 85dB. | ||||
Unplanned vehicle movements | Plant on plant incidents. Pedestrian injuries | A strict Plant / Vehicle and operative / pedestrian separation regime will be enforced. Wearing of high visibility vests. | ||||
Lack of oxygen | Asphyxiation | Forced Air movement as necessary. | ||||
Venomous insects Snakes. | Potentially lethal bites | Areas to be checked prior to entry Operatives to be briefed on what constitutes a potentially lethal insect or snake | ||||
2 | Erecting permanent protection | Use of plant | Swing area entrapment. injuries | No person will work within the traversing arc of lifting equipment unless authorised | |||
Unplanned vehicle movements | Plant on plant incidents. Pedestrian injuries | A strict Plant / Vehicle and operative / pedestrian separation regime will be enforced. Wearing of high visibility vests. | |||||
Traffic | RTA’s Vehicles entering work area | A strict Plant / Vehicle and operative / pedestrian separation regime will be enforced. Wearing of high visibility vests. Flashing beacons at night, use of a flagman | |||||
This JHA was prepared by:- | This JHA was authorised by:- | ||||||
D L Woods ESH Manager AAJ-JV Date:-07 November 2006 | Name & Position to be inserted HL Salama, Construction Manager – Buildings Date:- 07 November 2006 | ||||||
TASK:__________________________________________________________________ | Date: ___________________ | ||
Persons in Charge | Designation | Signature | |
1 | |||
2 | |||
3 | |||
4 | |||
5 | |||
6 |
All Employees are to sign below in recognition and understanding of this JHA content
1 | 11 | 21 | |||
2 | 12 | 22 | |||
3 | 13 | 23 | |||
4 | 14 | 24 | |||
5 | 15 | 25 | |||
6 | 16 | 26 | |||
7 | 17 | 27 | |||
8 | 18 | 28 | |||
9 | 19 | 29 | |||
10 | 20 | 30 |
Excellent pointers to know especially for a construction site . Thank you 😊