Project:            2B + G + 14+ Lower Roof Hotel Building on Plot No. xxx at Al Barsha 1st, Dubai

     Subject            : Electrical and TV points requirement on the existing column in Stag bar   area. (MEP drawing for stag bar attached here with for column) of ref.no. CC/AP/269/SH/DTS/004.

Dear Sir,

With reference to above, we received the approved MEP drawing for the Stag bar area and please note that we did the marking of MEP points in the Stag bar area and there are some electrical and Tv points at the existing columns surface.

So if we want to concealed the conduits at the column surface, we need to have cutting in the column face up to re-bar, will it advisable since main column at ground floor.

We are requesting that either allow us for cutting in the column for conduiting and steel will exposed or advise your opinion to ID for additional cladding around column surface to fix the required electrical points on column and will covered in cladding.

This for kind information and request to advise.

Regards,

For xxx Contracting L.L.C.

xxx

Project Manager