1 – Lumpsum Contract In a lump sum contract, the engineer or/and contractor agrees to do the specified project for a fixed price. Also called “fixed fee contracts,” these are often used for engineering ventures.A lump sum or fixed fee contract is appropriate if the scope and schedule of the project are sufficiently defined to… Continue reading Types of Construction Contracts
Author: Md Abu Zaed Khan
Hello, this is Engr. Zaed Khan Planning Engineer, Associate member of Society of Engineers UAE. Expert in construction project planning, FIDIC red book, computation of extension of time claim, Contract agreement and contractual letters.
Electrical Thumb Rules-(Part 1).
Cable Capacity: • For Cu Wire Current Capacity (Up to 30 Sq.mm) = 6X Size of Wire in Sq.mm • Ex. For 2.5 Sq.mm=6×2.5=15 Amp, For 1 Sq.mm=6×1=6 Amp, For 1.5 Sq.mm=6×1.5=9 Amp • For Cable Current Capacity = 4X Size of Cable in Sq.mm ,Ex. For 2.5 Sq.mm=4×2.5=9 Amp. • Nomenclature for cable Rating… Continue reading Electrical Thumb Rules-(Part 1).
QA/QC Engineer/Inspector Role and Responsibilities in Construction
Being a QA/QC (Quality Assurance/Quality Control) Engineer or Inspector in construction projects is a crucial role to ensure that the work meets the specified standards and requirements. Here are some basic guidelines and responsibilities for QA/QC professionals in the construction industry:1. Understand Project Specifications:Familiarize yourself with the project specifications and requirements. Know the relevant codes… Continue reading QA/QC Engineer/Inspector Role and Responsibilities in Construction
Construction projects experience cost overruns
Why do many construction projects experience cost overruns ranging from 10% to over 100%, and how can these overruns be rectified? The prevalence of cost overruns in construction projects is a significant issue, resulting in millions of dollars in losses for the industry annually and the wastage of valuable engineering and construction labor resources. This… Continue reading Construction projects experience cost overruns
Aligning the Primavera P6 program with actual site conditions
Aligning the Primavera P6 program with actual site conditions entails updating the project schedule to reflect the current progress and circumstances on the construction site. This ensures the program accurately mirrors the project’s status, facilitating effective project management. Here’s how you can synchronize the Primavera P6 program with real site conditions: Aligning the Primavera P6… Continue reading Aligning the Primavera P6 program with actual site conditions
Annual leave Automatic response email template
Subject: Out of Office: Annual Leave Hello, Thank you for your email. I am currently out of the office on annual leave and will not be able to respond until [Date of Return]. During this time, I will have limited access to email. If your matter is urgent, please contact [Alternative Contact Person] at [Alternative… Continue reading Annual leave Automatic response email template