Method Statement for Sub base and Gravel Base

JOB HAZARD ANALYSIS Placing of Sub-base and Gravel base

The responsible person is to ensure the control measures below are in place before the activity is carried out

  TASK: Placing of Sub-base and Gravel base    Date:28 September xxx
NoACTIVITYHAZARDRISKCONTROL MEASURES TO MINIMISE / ELIMINATE RISKRESPONSIBLE PERSON
1Service location surveyManual handling operations (MHO’s)Work related upper limb disorders. Musculoskeletal injuries. Cuts, abrasions. Foot / toe injuries, eye injuriesMaximum use of equipment to reduce need for MHO’s MHO Training prior to any work being carried out (Toolbox talk attached) This training is to be documented
Wearing of gloves Wearing of safety shoes Wearing of safety glasses
 
  Extreme heatDehydration, heat exhaustion. Heat strokeReady supply of cold water and Oral rehydration products ie Salt & Dextrose tablets. No work to be conducted under the sun between 12:00 & 15:00 (July & August only) 
2Marking out of Area to be layedUse of hand toolsCuts, abrasions, broken bones, eye injuriesSupervisor to inspect hand tools prior to commencement of works to ensure tools are in good condition. Site minimum PPE to be worn at all times 
  Marker paintCOSHH related injuriesPaint to be COSHH assessed prior to use and COSHH assessment finding to be implemented prior to use of any such paint. (Toolbox talk attached) 
  Manual HandlingWork related upper limb disorders. Musculoskeletal injuries. Cuts, abrasions, eye injuriesMaximum use of equipment to reduce need for MHO’s MHO Training prior to any work being carried ou t, this training is to be documented Wearing of gloves Wearing of safety shoes Wearing of safety glasses 
  DustPoor visibility, respiratory  Injuries Dust explosionAn effective Dust suppression programme will be in place prior to the works commencing, and thereafter as necessary to suppress the dust sufficiently. In the event that the dust suppression programme fails operatives will be issued suitable RPE. In the event the dust causes restricted vision, operatives will be removed from the excavation. 
  Extreme heatDehydration, heat exhaustion. Heat strokeReady supply of cold water and Oral rehydration products ie Salt & Dextrose tablets. No work to be conducted under the sun between 12:00 & 15:00 (July & August only). In the event that natural airflow is restricted, industrial air movers will be employed. No worker shall work within the excavation for longer than 40 minutes without a ten minute break in a shaded area which will be provided for this purpose. 
  Vehicle overturningEntrapment, Crush injuriesRoll bars will be fitted to vehicles where there is no “designed in” Cab protection. Seat belts will be worn. Areas of extreme un-evenness will be graded as and when necessary. 
  NoiseDeafness, CEMP violationNoise monitoring will be conducted to measure noise as required by the CEMP. Proactive measures will be taken to reduce noise SFAIRP. Hearing protection will be available on request to all exposed staff should the TWA Noise level reach 85dB. Hearing protection will be mandatory if the TWA background noise reaches 90dB. 
  Unplanned vehicle movementsPlant on plant incidents. Pedestrian injuriesA strict Plant / Vehicle and operative / pedestrian separation regime will be enforced.
Wearing of high visibility vests.
 
  Venomous insects.Potentially lethal bitesAreas to be excavated which may be covered with vegetation will be beaten ala “Turkey Shoot” prior to any works being undertaken. Operatives will be briefed on what constitutes a potentially lethal insect, this will be documented 
  Venomous SnakesPotentially lethal bitesAreas to be excavated will be beaten ala “Turkey Shoot” as applicable prior to any works being undertaken. Operatives will be briefed on what constitutes a potentially lethal insect. 
This JHA was prepared by:- This JHA was authorised by:-
D L Woods ESH Manager AAJ-JV   Date:-28 September 2006Name & Position to be inserted Amjed Nakad, Section Engineer Date:- 28 September 2006
  TASK:__________________________________________________________________    Date: ___________________
 Persons in ChargeDesignationSignature
1       
2       
3       
4       
5       
6       

All Employees are to sign below in recognition and understanding of this JHA content

1 11 21 
2 12 22 
3 13 23 
4 14 24 
5 15 25 
6 16 26 
7 17 27 
8 18 28 
9 19 29 
10 20 30 

Leave a Comment

Your email address will not be published. Required fields are marked *

Scroll to Top