Pods Damaged by other at site

DAMAGE/LOSS Report for Pods on Site: Tower 2, level 3 to 15 POD ceiling and mirror wall due to water leakage

Our Ref: xxx Date: xxx To                           : xxx Construction Engg. Corp. (Middle East) LLC                                   P. O. Box xxx   Dubai, U.A.E. Attention            : Mr. xxx Project                 : xxx – Zabeeel Second, Dubai, UAE. Subject:               DAMAGE/LOSS Report for Pods on Site: Tower 2, level 3 to 15 POD ceiling and mirror wall due […]

DAMAGE/LOSS Report for Pods on Site: Tower 2, level 3 to 15 POD ceiling and mirror wall due to water leakage Read Post »

METHOD STATEMENT FOR LV SWITCHGEAR AND MOTOR CONTROL CENTER INSTALLATION

Main Contractor Instruction –Rectification of Switch Location- Tower 3, Pod 21, Type A.

Our Ref: xxx Date: xxx To                           : xxx Construction Engg. Corp. (Middle East) LLC                                   P. O. Box xxx   Dubai, U.A.E. Attention            : Mr. xxx Project                 : xxx – Zabeeel Second, Dubai, UAE. Subject:               Main Contractor Instruction –Rectification of Switch Location- Tower 3, Pod 21, Type A. Dear Sir, We refer to

Main Contractor Instruction –Rectification of Switch Location- Tower 3, Pod 21, Type A. Read Post »

Access Panel Opening

Main Contractor’s Instruction – Access Panel Opening at POD 28 in Tower 1 Type B.

Our Ref: xxx Date: xxx To                           : xxx Construction Engg. Corp. (Middle East) LLC                                   P. O. Box xxx   Dubai, U.A.E. Attention            : Mr. xxx Project                 : xxx – Zabeeel Second, Dubai, UAE. Subject :              Main Contractor’s Instruction – Access Panel Opening at POD 28 in Tower 1 Type B. Dear Sir,

Main Contractor’s Instruction – Access Panel Opening at POD 28 in Tower 1 Type B. Read Post »

Understand the given instructions

Main Contractor’s Instruction – Tower 2 and 3 Heat Detector provision.

Our Ref: xxx Date: xxx To                           : xxx Construction Engg. Corp. (Middle East) LLC                                   P. O. Box xxx   Dubai, U.A.E. Attention            : Mr. xxx Project                 : xxx – Zabeeel Second, Dubai, UAE. Subject:               Main Contractor’s Instruction – Tower 2 and 3 Heat Detector provision. Dear Sir, We refer to your letter

Main Contractor’s Instruction – Tower 2 and 3 Heat Detector provision. Read Post »

Keys Handing over

Handing Over/Confirmation of balance sanitary ware, fittings and accessories.

Our Ref: xxx Date: xxx To                           : xxx Construction Engg. Corp. (Middle East) LLC                                   P. O. Box xxx   Dubai, U.A.E. Attention            : Mr. xxx Project                 : xxx – Zabeeel Second, Dubai, UAE. Subject :     Handing Over/Confirmation of balance sanitary ware, fittings and accessories. Dear Sir, We refer to your letter ref: xxx

Handing Over/Confirmation of balance sanitary ware, fittings and accessories. Read Post »

Claim rejected

Rejection of deductions received on December xxx Payment Certificate

Our Ref: xxx Date: xxx To                           : xxx Construction Engg. Corp. (Middle East) LLC                                   P. O. Box xxx   Dubai, U.A.E. Attention            : Mr. xxx Project                 : xxx – Zabeeel Second, Dubai, UAE. Subject                 : Rejection of deductions received on December xxx Payment Certificate Dear Sir, We categorically reject the deductions shown on

Rejection of deductions received on December xxx Payment Certificate Read Post »

Sanitary Accessories

Completion of Production.

Our Ref: xxx Date: xxx To                           : xxx Construction Engg. Corp. (Middle East) LLC                                   P. O. Box xxx   Dubai, U.A.E. Attention            : Mr. xxx Project                 : xxx – Zabeeel Second, Dubai, UAE. Subject                 : Completion of Production. References         :  xxx dated 09th August, xxxx. Dear Sir, We are writing to inform you that

Completion of Production. Read Post »

Critical Path

Programme of works- Phase C additional 105 pods

Our Ref: xxx Date: xxx To                           : xxx Construction Engg. Corp. (Middle East) LLC                                   P. O. Box xxx   Dubai, U.A.E. Attention            : Mr. xxx Project                 : xxx – Zabeeel Second, Dubai, UAE. Subject                 : Programme of works- Phase C additional 105 pods. Dear Sir, We are writing you with reference to the

Programme of works- Phase C additional 105 pods Read Post »

Shop Drawing

Phase C pods production on hold due to RCP drawings.

Our Ref: xxx Date: xxx To                           : xxx Construction Engg. Corp. (Middle East) LLC                                   P. O. Box xxx   Dubai, U.A.E. Attention            : Mr. xxx Project                 : xxx – Zabeeel Second, Dubai, UAE. Subject                 : Phase C pods production on hold due to RCP drawings. Dear Sir, We are writing to inform you

Phase C pods production on hold due to RCP drawings. Read Post »

Undertaking Letter

Workmen Compensation Insurances

Our Ref: xxx Date: xxx To                           : xxx Construction Engg. Corp. (Middle East) LLC                                   P. O. Box xxx   Dubai, U.A.E. Attention            : Mr. xxx Project                 : xxx – Zabeeel Second, Dubai, UAE. Subject                 : Workmen Compensation Insurances Dear Sir, As per your letter ref. xxx, dated 16th Aug xxx, please find the

Workmen Compensation Insurances Read Post »