November 2022

METHOD STATEMENT FOR LV SWITCHGEAR AND MOTOR CONTROL CENTER INSTALLATION

Method Statement Title: Testing and Commissioning of VFD’s.

Method Statement Title: Testing and Commissioning of VFD’s. 1.0       Scope 1.1       This method statement details the Testing and Commissioning of VFD’s according to the specification section 15725. Note:   A separate method statement is submitted for installation of MCC’s and     VFD’s. (Ref. ETA /MS/E-012) 2.0       Material 3.0       Applicable Location 3.1       VFD’s at East & West Podium […]

Method Statement Title: Testing and Commissioning of VFD’s. Read Post »

METHOD STATEMENT FOR LV SWITCHGEAR AND MOTOR CONTROL CENTER INSTALLATION

Method Statement Title: Testing and Commissioning of LV Switch boards / Panels.

Method Statement Title: Testing and Commissioning of LV Switch boards / Panels. 1.0       Scope 1.1       This method statement details the Testing and Commissioning of LV Switch boards / Panels  according to the specification section 16402.             Note :  A separate method statement is submitted for installation of L.V. Switch                         boards / Panels. ( Ref.

Method Statement Title: Testing and Commissioning of LV Switch boards / Panels. Read Post »

METHOD STATEMENT FOR LIGHTING FIXTURES INSTALLATION

Method Statement Title: Testing and Commissioning of Light fixtures.

Method Statement Title: Testing and Commissioning of Light fixtures. 1.0       Scope 1.1       This method statement details the Testing and Commissioning of Light fixtures  according to the specification section 16505.             Note:   A separate method statement is submitted for installation of Light fixture.                         (Ref. ETA /MS/E-023) 2.0       Material 3.0       Applicable Location 4.0       Instruments. 4.1       Insulation

Method Statement Title: Testing and Commissioning of Light fixtures. Read Post »

METHOD STATEMENT FOR LV SWITCHGEAR AND MOTOR CONTROL CENTER INSTALLATION

Method Statement Title: Testing and Commissioning of Final Distribution Boards.

Method Statement Title: Testing and Commissioning of Final Distribution Boards. 1.0       Scope 1.1       This method statement details the Testing and Commissioning of Final Distribution board (DBs) according to the specification section 16415. 2.0       Material 3.0       Applicable Location 4.0       Instruments. 4.1       Insulation tester. 4.2       ELCB tester. 4.4       Multimeter. Note : The instruments used for  testing and

Method Statement Title: Testing and Commissioning of Final Distribution Boards. Read Post »

METHOD STATEMENT BUSBAR TRUNKING SYSTEM

Method Statement Title: Testing and Commissioning of Bus Duct System

Method Statement Title: Testing and Commissioning of Bus Duct System 1.0       Scope 1.1       This method statement details the Testing and Commissioning of Bus Duct System in accordance to the specification section 16450. 2.0       Material 3.0       Applicable Location 4.0       Instruments. Note : The instruments used for  testing and commissioning shall be checked and ensured that they

Method Statement Title: Testing and Commissioning of Bus Duct System Read Post »

METHOD STATEMENT FOR LV SWITCHGEAR AND MOTOR CONTROL CENTER INSTALLATION

Method Statement Title: Testing and Commissioning of Isolators & Switching accessories

Method Statement Title: Testing and Commissioning of Isolators & Switching accessories 1.0       Scope 1.1       This method statement details the Testing and Commissioning of Isolators and Switching accessories according to the specification section 16415. 2.0       Material 3.0       Applicable Location 4.0       Instruments. 4.1       Insulation tester. 4.2       Multimeter ( Continuity test) Note : The instruments used for  testing

Method Statement Title: Testing and Commissioning of Isolators & Switching accessories Read Post »

Installation Check List For ATS

Method Statement Title: Testing and Commissioning of Generator and ATS

Method Statement Title: Testing and Commissioning of Generator and ATS 1.0       Scope 1.1       This method statement details the Testing and Commissioning of Generator and ATS  according to the specification section 16402. Note:   A separate method statement is submitted for installation of Generator and ATS. (Ref. ETA /MS/E-022) 2.0       Material 3.0       Applicable Location 4.0       Instruments. Note

Method Statement Title: Testing and Commissioning of Generator and ATS Read Post »

Background music and public address system

Method Statement Title: Installation of Public Address System

Method Statement Title: Installation of Public Address System 1.0       Scope This method statement details the method of installation of Public Address System.             Note             A separate Method Statement Ref. ETA/MS/E- 0   shall be submitted for testing and commissioning of the Public Address System. 2.0       Material 2.3       Type of Speakers shall be as per approved

Method Statement Title: Installation of Public Address System Read Post »

Background music and public address system

Method Statement Title: Testing and Commissioning of Public Address System

Method Statement Title: Testing and Commissioning of Public Address System 1.0       Scope This method statement details the method of Testing and commissioning of  Public Address System.             Note A separate Method Statement Ref. ETA/MS/E-   shall be submitted for Installation of  the Public Address System. 2.0       Material 2.3       Speakers shall be as per approved shop drawing.

Method Statement Title: Testing and Commissioning of Public Address System Read Post »

METHOD STATEMENT FOR EARTHING SYSTEM INSTALLATION

Method Statement Title: Testing of Earthing System

Method Statement Title: Testing of Earthing System 1.0       Scope 2.0       Material 3.0       Method 3.1       Testing equipment   4.1.1    Earth tester.  4.1.2    Multimeter.                          The calibration certificates of testing instruments will be verified for validity                        prior to use. a.         Earth electrode will be tested with earth tester by 3 point test         method. b.         All the

Method Statement Title: Testing of Earthing System Read Post »

Scroll to Top