POWER, TELEPHONE, INTERCOM, TV CABLES, WIRES AND PULLING IN RESPECTIVE FIRST FIX DEVICE BOXES AND IN PANEL ENCLOSURE

MATERIAL TO BE USED:- Power Cables are of stranded cu conductor multicore XLPE insulated PVC sheathed feeder cables 0.6/lKV of 90°C temperature manufactured by Jeddah Cables. Telephone wires and cables   2 and 12 paired are multi paired indoor type solid plain copper conductor 0.6 mm dia PVC insulated and shielded, manufactured by Amaco cables. Intercom wires are 3 pair, PVC […]

CONDUIT DEVICES BACK BOXES, PANEL ENCLOSURES, TRC, SPLITTER, AND PULL BOXES INSTALLATION IN BLOCK WALL

MATERIAL TO BE USED:- Galvanized steel back boxes, 7cm x 7cm x 4.7cm depth  1.1  mm wall thickness with Earth terminals are used for wiring devices as back boxes Eletra make. For panel enclosure metallic enclosures zinc coated 1,2mm thick with epoxy painting ivory color and with required knock out is provided Merlin Gerin make Telephone and splitter boxes are […]

METHOD STATEMENT FOR TV SPLITTER INSTALLATION AND WIRING TERMINATIONS

TV SPLITTER INSTALLATION AND WIRING TERMINATIONS MATERIAL TO BE USED:- Flush mounted TV splitter metal enclosure with size 150xl50xlOOmm manufactured by Eletra with sufficient knock outs and frame to install 2 way splitter and 6 way splitter in this enclosure. RG 6 – C5760 Coaxial Cable is installed between individual TV outlets and 6 way splitter boxes installed in ground […]

METHOD OF STATEMENT FOR PLUMBING FIXTURE INSTALLATION

METHOD OF STATEMENT FORPLUMBING FIXTURE INSTALLATION 2.3.10.1 Install the mixer and its accessories to the lavatory.2.3.10.2 Connect the flexible hose of the mixer to the angle valves for both hot and cold water.2.3.10.3 Apply Teflon tape to threaded fittings in reverse direction of the tight. Do not over-tight the fittings.2.3.10.4 Install the trap on the lavatory outlet and connect to […]

METHOD OF STATEMENT FOR MECHANICAL WORKS FOR SANITARY DRAINAGE

METHOD OF STATEMENT Scope: This method of statement applies to mechanical works for sanitary drainage of buildings. Purpose: The basis of construction /installation for effective and qualified results Significant materials needed: Abbreviations:           ASTM         American Society for Testing Materials           UPC             Uniform Plumbing Code           IAPINO       International Association of Plumbing and                                            Mechanical Officials           PVC             Poly Vinyl Chloride […]

METHOD OF STATEMENT FOR WATER SUPPLY PIPE INSTALLATION

METHOD OF STATEMENT FOR WATER SUPPLY PIPE INSTALLATION A-1. Select and follow manufacturers recommendations for types of solvent cement for such conditions as temperature over 100ºF (38ºC), humidity over 60% or use of schedule 80 fittings. A-2. Proper handling of solvent cement should be strictly done to maintain effectiveness. A-3. Keep solvent cement closed and in shade when not in […]